Similar Projects
Pine Bay
New Construction - 314,568 SF
Conception
$10,000,000 CJ est. value
West Palm Beach, FL 33415

Naranja Lakes Apartments
New Construction - 244,466 SF
Conception
$10,000,000 CJ est. value
Leisure City, FL

Naples Beach Hotel & Golf Club Redevelopment
New Construction, Demolition
Design
$10,000,000 CJ est. value
Naples, FL

Wreckers Cay Apartments at Stock Island
New Construction, Demolition - 306,304 SF
Design
Key West, FL 33040

Bald Point State Park - Day Use Area and Kayak Launch
Bidding
Alligator Point, FL 32346

Capehart Park Basketball Cover
New Construction, Renovation
Bidding
$150,000 est. value
Orlando, FL 32822

Imagine Clearwater Park Early Release Sitework Package
Sub-Bidding
Clearwater, FL

Pine Island Park Reconstruction
Post-Bid
Less than $7,416,001 est. value
Plantation, FL 33324

Design-Build Services for Parks and Recreation Master Plan
Post-Bid
Less than $400,000 est. value
Tampa, FL 33602

Newsom High School Construction of ROTC Obstacle Course Construction
Results
Less than $100,000 est. value
Lithia, FL 33547

Glazier Gates II Park Construction
Results
Bradenton, FL 34205

The Gatherings at Lake Nona
New Construction - 195,460 SF
Construction
Orlando, FL 32827

Five Park
New Construction
Construction
$345,000,000 est. value
Miami Beach, FL 33139

Lake Sana Development
New Construction
Conception
Miami, FL 33010

Newfield - Master Plan
New Construction - 296,000 SF
Design
$10,000,000 CJ est. value
FL 34990

Last Updated 04/07/2021 11:23 AM
Project Title

Design Build Services - Sertoma Park Baseball Field Renovations

Physical Address View project details and contacts
City, State (County) Winter Haven, FL   (Polk County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of the project is anticipated to include all survey, engineering, landscape architecture, architecture, permitting, specifications, public involvement, and construction to complete the design elements. Primary improvements are based field improvements to the park. These include but are not limited to: Field renovations to include but not limited Redesign of fields to accommodate larger dimensions Redesign/relocation of tee ball field Turf Replacement-Celebration Bermuda Sod Irrigation Upgrades as necessary Clay replacement, base plugs and bases Surface drainage enhancements as necessary for field renovations Laser grading of fields based on field design and elevations Grading as necessary for new improvements Based on improvements and soil samples, specific soil amendments may be necessary to be specified and provided as part of the design. Design team shall have access to a professional to assist with these matters if necessary. Demolition of existing dugouts and construction of new modern Replacement of score boards. At a minimum they shall be wireless and LED. A power source will be needed.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents