Similar Projects
Reported | 12/08/2021 12:00 AM |
Project Title | HVAC - AG Building |
Physical Address | View project details and contacts |
City, State (County) | Carthage, NC (Moore County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Each person must wear a mask when in the building. Contractor is responsible to remove all units and trash from County property. Contractor is responsible for the removal and disposable of all freon. Unit can be a Trane or Carrier. Install a new VFD (if one is not included with unit). All high and low voltage to be reconnected and supported with approved fasteners and fused properly. Unit currently has Metasys controls that must be removed and then installed back on the new equipment. Duct detector must be removed from and then installed back on the new equipment and will have to be tested. Include a drain pan under the new unit with a float switch installed and tested. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |