Similar Projects
Carvana Tower
New Construction - 5,790 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Denver, CO 80222

Stevinson Toyota East Expansion
Addition
Conception
Denver, CO 80247

Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Murphy Express #8617 / Denver
New Construction, Infrastructure - 2,800 SF
Design
$2,500,000 CJ est. value
Denver, CO 80202

Campus Main Switchgear Replacement
Renovation
Sub-Bidding
$928,533 CJ est. value
Denver, CO 80204

Switchgear and Protective Relay Maintenance
Alteration
Post-Bid
CO

J059--UPS System & Generator Maintenance Services
Term Contract
Post-Bid
Denver, CO 80209

2016-034P15 Adams County Ysc Replacement Solar Photovoltaic
Term Contract
Results
Denver, CO

Electrical Services
Term Contract
Results
Denver, CO

Murphy Express #8936
New Construction - 2,800 SF
Construction
$500,000 to $1,000,000 CJ est. value
Denver, CO 80222

Maverik C-Store - Denver
New Construction - 5,637 SF
Construction
$5,000,000 est. value
Denver, CO 80221

7-Eleven Convenience Store
New Construction - 6,000 SF
Pending Verification
$1,000,000 est. value
Denver, CO 80216

AHEC-22918-B - MSU Denver Fiber Loop Expansion
Alteration
Post-Bid
CO

Ikaa007 Dys Nightlight Installation (Calm)
Results
Less than $21,000 est. value
Golden, Lakewood, CO 80401

Commercial and Multifamily Building Electrification
Alteration
Post-Bid
Denver, CO

Last Updated 08/05/2022 09:05 AM
Project Title

SITE-Electric Bus Charging Stations

Physical Address View project details and contacts
City, State (County) Denver, CO 80202   (Denver County)
Category(s) Commercial, Single Trades
Sub-Category(s) Electric, Gas Station, Vehicle Sales/Service
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $490,260 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Provide a new medium voltage (MV) pathway from building 569 (TB-15) to a new transformer and secondary connection cabinet to serve four (4) new EV bus charging stations. It also consists of reconfiguration of parking lot 583 to accommodate four (4) 40 EV busses with charging stations and asphalt, concrete, and paint stripe restoration of the lot.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents