Similar Projects
Reported | 12/20/2018 12:00 AM |
Project Title | GSA 11 D/B Fire Alarm System Head-End Replacement Project, Hubert Humphrey Building |
Physical Address | View project details and contacts |
City, State (County) | Washington, DC 20407 (District of Columbia County) |
Category(s) | Single Trades |
Sub-Category(s) | Security/Communications |
Contracting Method | Design-Build. Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | $500,000 to $1,000,000 |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Contractor shall provide a complete head-end fire alarm control unit (FACU) to upgrade to the Siemens XLS (FACU). This project is a design build project and included providing all engineering, programming, labor, testing and commissioning. The contract shall be divided into two phases, the design phase and the construction phase. Each phase shall have a notice to proceed. Design phase includes verification of all field devices to ensure that these devices shall remain compatible and working as part of the new total system upon completion. Design phase also included development of proposed Fire Alarm Control Unit drawings. Contractor to provide price option for moving amplifiers to locations throughout the building. All drawings shall be approved by GSA Fire Protection Office before material is purchased and construction phase begins. The design work shall fulfill the scope of work requirement for each technical discipline. | ||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |