Similar Projects
Turkey Hill
New Construction
Conception
Wilkes-Barre, PA 18702

Mach 1 Car Wash
New Construction
Conception
Hanover, PA 17331

Auto Spa Express Car Wash
New Construction - 5,197 SF
Design
$650,000 est. value
York, PA 17401

Mercer Management and Lincoln ABC Development
New Construction, Renovation
Design
Langhorne, PA

Mansfield Design and Build Wash Bay
New Construction
Post-Bid
Mansfield, PA 16933

Wash Rack Replacement at Ross, Collier Garages Cyclone Installation At Ross, East Liberty Garages
Results
Less than $4,200,000 est. value
Pittsburgh, PA

FM -7217 Electric Wayne County Vehicle Wash
Results
PA

Quattro Development
New Construction - 23,927 SF
Construction
York, PA 17403

9th Street Car Wash
New Construction
Construction
Berwick, PA 18603

Scholl's Truck and Car Wash
New Construction
Pending Verification
Perkasie, PA 18944

Kinsley Car Wash
New Construction - 3,136 SF
Conception
$550,000 to $625,000 est. value
York, PA 17403

Carwash
New Construction - 2,835 SF
Design
$500,000 to $1,000,000 CJ est. value
Monroeville, PA 15146

FM-7217 Plumbing Wayne County Vehicle Wash
Results
$200,000 to $499,999 est. value
PA

Star Car Wash
New Construction - 4,594 SF
Construction
$25,000 est. value
North Wales, PA 19454

The Car Wash on Hamilton
New Construction - 4,860 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Macungie, PA 18062

Last Updated 03/01/2019 01:31 AM
Project Title

FM-7229 Construction Vehicle Wash Westmoreland Co

Physical Address View project details and contacts
City, State (County) PA   (Westmoreland County)
Category(s) Commercial
Sub-Category(s) Car Wash
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 to $499,999
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Remove existing pavement concrete and interior wash bay concrete floor, overhead and man doors, wash systems and drainage systems. Construct interior site improvements, sanitary site utilities to within 5-feet of the building line in accordance with Contract Drawings and Project Manual. Coordinate work with Plumbing Construction Contract (.3). New building elements to include but not be limited to Interior Vehicle Wash Bay with heated, reinforced concrete floor slabs and approach Slabs and Pump Room equipment improvements. 9000-3501 Lump Sum 1.000 01 n n1 Proj General Construction (0.1)
Details
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents