Replacement of the Sand Hill Water Storage Tank
Design
Less than $2,070,000 est. value
Cottekill, NY

Water System Improvements
Bidding
Hancock, NY

Tank Lining
Post-Bid
Buffalo, NY 14202

Water Storage Tank Replacement
Post-Bid
Less than $2,350,000 est. value
Pavilion, NY 14525

Water Storage Tank Replacement
Results
Cairo, NY

Gallon Water Tank Rehabilitation
Results
South Glens Falls, NY 12803

FAGE USA New Water Storage Tank Building
New Construction, Renovation
Construction
Johnstown, NY 12095

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Furnish and Install a Submersible Water Storage Tank Mixer and Cathodic Protection System
Post-Bid
Petersburg, NY 12138

Rehabilitation of 100,000 Gallon Elevated Water Storage Tank
Results
Ballston Spa, NY 12020

Lake Water System Improvements Project - Contract No. 3 - Spray Aeration Treatment
Post-Bid
Less than $225,000 est. value
Round Lake, NY 12151

Dover Ridge Water Supply – Water System Improvements
Results
Less than $400,000 est. value
Poughquag, NY 12570

Water Storage Tank Improvement
Post-Bid
Wilson, NY 14172

BPS-2 Water Storage Tank THM Removal System
Results
Watertown, NY 13601

Last Updated 03/29/2021 08:31 AM
Project Title

STL Water Tower Replacement

Physical Address View project details and contacts
City, State (County) Massena, NY 13662   (Saint Lawrence County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of a new 201,000-gallon elevated glass fused-to-steel water storage tank on top of a concrete pedestal base, including tank foundation and all associated tank appurtenances. Tank pedestal will also include a room to house process equipment. Demolition of the existing tank including all environmental controls. Demolition of the existing boiler house including all environmental controls. Installation of process related features including but not limited to piping, fittings, altitude valve, reduced pressure zone valve assembly, isolation valves, chlorine residual analyzer, pressure transducers, and spray stripping recirculation pump within the tank pedestal room. Sitework associated with the proposed tank including but not limited to grading, drainage, water mains and valves, and paving. Modifications within the existing treatment facility, including installation of a new sodium hypochlorite feed system and replacement of booster pump associated with the chilled water system. Electrical installation to support the entire project

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents