Similar Projects
I-90/I-5, E Sunset Way Vic and Nb Lowell Rd Vic Pccp Exp Jnt Rehab and Deck Overlay
Infrastructure
Bidding
Less than $1,250,000 est. value

2022 Western Region Pavement Preservation MATOC
Alteration
Bidding
$300,000 to $10,000,000 est. value

8th Street Improvements Project
Alteration
Post-Bid
$739,767 est. value
Marysville, WA

Harbour Reach Drive Improvements
Infrastructure
Results
$915,224 est. value
Mukilteo, WA 98275

Fisherman's Harbor Commercial Development Parcels A8 & A17
New Construction, Infrastructure, Alteration - 6,000 SF
Results
$4,300,000 to $4,700,000 est. value
Everett, WA 98213

SR 104, Edmonds Ferry Terminal Paving Preservation
Infrastructure
Bidding
$400,000 to $500,000 est. value
WA

172nd Street NE & 40th Avenue Signal and Median Improvements
Infrastructure, Alteration
Results
$1,846,000 est. value
Arlington, WA 98223

SR 9 SR 204 Intersection Improvements Demo 2
Infrastructure
Bidding
Less than $100,000 est. value
WA

164th Street SW Transmission Main Connection
Infrastructure
Results
$10,000,000 to $12,000,000 est. value
WA

Exposed Sewer Pipe Repairs - Site 5
Infrastructure
Results
$3,200,000 to $3,700,000 est. value
Bothell, WA 98011

SR 204 Intersection Improvements
Infrastructure
Results
WA

South Lake Stevens Road Intersection Improvements
Infrastructure
Results
$5,000,000 to $7,500,000 est. value
WA

SR 9, Bickford Ave Intersection Improvement
Infrastructure
Results
$3,000,000 to $4,000,000 est. value
WA

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

Swift Brt Orange Line Construction
Infrastructure
Results
Everett, WA 98201

Reported 02/23/2022 12:00 AM
Project Title

2022 Street Overlay and ADA Ramps

Physical Address View project details and contacts
City, State (County) Stanwood, WA 98292   (Snohomish County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $360,000 to $440,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The 2022 Street Overlay and ADA Ramps project consists of improving two street sections. 68th Ave NW from Woodland RD to 280th ST, and 72nd Ave NW from 272nd to 276th St NW by grind and overlay, full depth HMA repair, curb ramps and channelization.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents