Similar Projects
Pryor Road - M150 Highway to Hook Road - 71632272 - City of Lees Summit
Infrastructure
Conception
$10,450,000 CJ est. value
Lees Summit, MO 64082

Pryor Road - M150 Highway to Hook Road - 71632272 - City of Lees Summit
Infrastructure
Conception
$10,450,000 CJ est. value
Lees Summit, MO 64082

Bank Stabilization and Navigation Project River Mile 0 to 140
Infrastructure
Design
$100,000,000 CJ est. value
Saint Louis, MO 63103

Gabriel Tower Apartments
Build-out, Renovation, Infrastructure - 101,646 SF
Bidding
$10,000,000 CJ est. value
Kansas City, MO 64127

Modernize Basement Kitchen and Morgue
Renovation, Infrastructure
Bidding
$5,000,000 CJ est. value
Columbia, MO 65201

Roadwork
Post-Bid
Kirksville, MO

Rehabilitation of Abandoned Property
Renovation, Infrastructure
Post-Bid
Ferguson, MO

2021 - Subdivision Asphalt Overlay
Results
$146,500 est. value
MO

Old State Route 21 Asphalt Pavement Improvements
Infrastructure
Results
Saint Louis, MO

7th Street Improvements
Infrastructure
Bidding
$2,897,043 est. value
Saint Louis, MO 63106

Asphalt Paving, Replacement and Maintenance Services
Term Contract, Infrastructure
Post-Bid
Saint Joseph, MO

Asphalt Repairs
Infrastructure - 9,212 SF
Results
Clayton, MO

Thomas Boulevard Mill and Overlay
Infrastructure
Bidding
$500,000 est. value
Sedalia, MO

63rd Street Reconstruction - Woodland Avenue to Prospect Avenue
Infrastructure
Post-Bid
Kansas City, MO 64121

2021 Concrete Pavement Replacement
Infrastructure
Results
Creve Coeur, MO

Last Updated 07/22/2022 04:38 PM
Project Title

Houston Memorial Airport

Physical Address View project details and contacts
City, State (County) Houston, MO 65483   (Texas County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $654,825 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Schedule I - Runway 16/34 Lighting Rehabilitation Schedule II - REIL's & PAPI's Rehabilitation Schedule III - Taxiway Lighting Rehabilitation Note that contractors will NOT be automatically added to new projects. You will need to re-submit the online form for access to new projects. Once granted access, additional projects will use your same login credentials. Note: Plan ahead when submitting the online request form and allow up to 2 business days for approval and access to projects. The bidder is required to provide all information as required within the Contract Documents. The bidder is required to bid on all items of every schedule or as otherwise detailed in the Instructions to Bidders. Each proposal must be accompanied by a bid guaranty in the amount of five (5) percent of the total amount of the bid. The bid guaranty may be by certified check or bid bond made payable to City of Houston. The final questions will be accepted until 3:00 p.m. (C.S.T.) Friday, May 20, 2022. Bids may be held by City of Houston for a period not to exceed 120 calendar days from the date of the bid opening for the purpose of evaluating bids prior to award of contract. The right is reserved, as City of Houston may require, to reject any and all bids and to waive any informality in the bids received. Construction for this project is expected to take 35 calendar day(s).

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents