Similar Projects
2021 Fire Hydrant Installation Annual
Term Contract
Bidding
Rapid City, SD

Anamosa Street Water Main
Infrastructure
Bidding
Rapid City, SD 57701

South Reservoir Control Valve and Miscellaneous Flow Meter Improvements
Post-Bid
$766,000 est. value
Sioux Falls, SD 57104

East 1st Street Extension
Post-Bid
$4,000,000 est. value
Tea, SD 57064

Gateway Boulevard (CR106) Phase 2 Improvements
Results
Less than $14,500,000 est. value
Tea, SD 57064

2021 Douglas/Washington Streets
Results
Elk Point, SD 57025

Enchantment Pressure Reducing Valve Facilities Short Term Piping Rehabilitation
Infrastructure
Bidding
Rapid City, SD

Replacing Existing Main Distribution Areas - Water Department and Installation of Flood Wall Berm at Pelican Sub - Electric Department
Post-Bid
Watertown, SD

Water Meter Replacement - Phase 2
Results
Brandon, SD

IGT Subdivision Improvements -Water and Sewer
Infrastructure
Bidding
Rapid City, SD

Main Street Streetscape
Post-Bid
Vermillion, SD

Ultrasonic Meters
Results
Sioux Falls, SD

2021 Water Main Replacement Installation
Post-Bid
Wessington Springs, SD 57382

33rd Street and Minnesota Avenue Intersection Reconstruction, Utility Improvements, Pavement Repairs and ADA Improvements
Results
Less than $1,760,000 est. value
Sioux Falls, SD

Streeter Drive Realignment
Post-Bid
$1,281,000 est. value
North Sioux City, SD

Last Updated 07/16/2021 02:12 PM
Project Title

Pump Station 215 Force Main Rehabilitation

Physical Address View project details and contacts
City, State (County) Sioux Falls, SD   (Minnehaha County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,021,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents