Similar Projects
Hvac Equipment Maintenance And Related Services
Term Contract
Bidding

Provide Wastewater Treatment Plant Improvements, Building 92 - HVAC
Alteration
Bidding
$1,000,000 to $2,000,000 est. value
Bedford Hills, NY 10507

HVAC Maintenance and Repairs
Term Contract
Post-Bid
Rye Brook, NY 10573

Heat Pump
Post-Bid
Cortlandt Manor, NY 10567

HVAC and Refrigeration Work for the 2020/2021 School Year
Results
$193,050 est. value
Briarcliff Manor, NY 10510

HVAC Materials and Service
Term Contract
Results
Pleasantville, NY 10570

Steam System Upgrades Phase II at Michaelian Office Building
Alteration
Bidding
$1,700,000 to $1,900,000 est. value
White Plains, NY 10601

Installation and Integration of Needlepoint Bipolar Ionization in All HVAC Systems
Post-Bid
Chappaqua, NY 10514

HVAC for the Valhala Union Free School District
Term Contract
Results
Valhalla, NY 10595

AT&T Generator Installation
Post-Bid
Yonkers, NY 10710

Replacement of Rooftop Unit (Heat/Cooling) at Water Treatment Plant
Results
Yonkers, NY 10703

HVAC Services
Post-Bid
Cortlandt Manor, NY 10567

HVAC Duct Replacement at Somers Intermediate School
Results
Somers, NY 10589

Fume Hood SVC
Post-Bid
White Plains, NY 10601

Window Ac/Heating Unit
Results
White Plains, NY 10601

Reported 12/06/2021 03:06 PM
Project Title

Westchester County ATCT HVAC Replacement

Physical Address View project details and contacts
City, State (County) White Plains, NY 10604   (Westchester County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Competent and qualified general or major mechanical contractors to perform HVAC replacement at the air traffic control tower (ATCT) at Westchester County Airport: - Remove and replace boiler and all associated appurtenances serving the base building and ATCT with new unit. - Remove and replace boiler hot water pumps with new and add VFDS. - Replace non-functional hot water heater in mechanical room with new heater. - Replace existing DDC system in entire facility with new DDC system. - Provide TAB and commissioning for all new work installed.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents