Similar Projects
The Oaks
New Construction, Infrastructure
Conception
$10,000,000 CJ est. value
Oklahoma City, OK 73131

North Choctaw Road, East 66 Highway - 1100 Feet north of the intersection of N Choctaw Road and East 66 Highway (Ward 7) - City of Oklahoma City
New Construction, Demolition, Infrastructure
Conception
$415,000 est. value
Oklahoma City, OK 73054

MAPS4 - Animal Shelter - (Ward 7) - City of Oklahoma City
New Construction, Infrastructure
Design
$29,162,700 CJ est. value
Oklahoma City, OK 73115

Bridge Rehabilitation - US 40
Infrastructure
Design
$1,500,000 CJ est. value
Oklahoma City, OK 73145

MAPS 4 - Family Justice Center - City Of Oklahoma
New Construction, Infrastructure
Bidding
$38,000,000 CJ est. value
Oklahoma City, OK 73102

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Atoka Raw Water Pipeline Atoka Pump Station O to Coalgate Pump Station
Infrastructure
Results
$42,390,684 CJ est. value
Oklahoma City, OK 73102

Atoka Raw Water Pipeline Atoka Pump Station O to Coalgate Pump Station
Infrastructure
Results
$42,390,684 CJ est. value
Oklahoma City, OK 73102

Crest Fresh Market - Covell and Sooner / Edmond
New Construction, Infrastructure - 101,422 SF
Construction
$27,000,000 CJ est. value
Edmond, OK 73034

7-Eleven Store 42235 / Oklahoma City
Demolition, New Construction, Infrastructure - 4,788 SF
Construction
$2,500,000 CJ est. value
Oklahoma City, OK 73139

Woody Creek East
New Construction, Infrastructure
Pending Verification
$19,000,000 CJ est. value
Edmond, OK 73034

New City Hall Building - City of Edmond
Demolition, New Construction, Infrastructure - 65,000 SF
Pending Verification
$32,600,000 CJ est. value
Edmond, OK 73034

Bike Lanes: Along the N. Villa AveNue., N. Youngs Boulevar., and N. Venice Blvd. alignments between NW 62nd St. and NW 10th St.
Infrastructure
Conception
$922,000 est. value
Oklahoma City, OK

Bridge and Approaches - US 40
Infrastructure
Design
$7,500,000 CJ est. value
Oklahoma City, OK 73145

Last Updated 10/03/2023 11:08 AM
Project Title

Joint Force Headquarters Civil Improvements Phase 3 - Bid Package #1

Physical Address View project details and contacts
City, State (County) Oklahoma City, OK 73111   (Oklahoma County)
Category(s) Government/Public, Heavy and Highway, Sewer and Water
Sub-Category(s) Military Facility, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Bid Package #1. Work includes: Steel, Joint Sealants, Signage, Earthwork and Site Demolition, Site Concrete, Fencing, Landscaping, & Storm Sewer. The bid shall be enclosed in a sealed envelope plainly marked and addressed as follows: The name and address of the bidder shall appear in the upper left-hand corner of the envelope. The Trade Contract Package number and description you are bidding shall be written on the cover of the envelope. Bids received after the official stated time or more than ninety-six hours, excluding Saturdays, Sundays, and Holidays, before the official stated time set for the opening of bids, will not be accepted. No bids may be submitted, changed, or withdrawn after the time of the opening of the bids. Pursuant to Title 61 Oklahoma Public Competitive Bidding Act. Crossland Construction Co. & the owner reserves the right to reject any or all bids or to waive any formalities or irregularities in any bid, and to accept the bid or bids which seem most advantageous to the Owner. Attention to the following bid requirements: Complete, sign and include Attachments A, B, C, D, & E found at the end of this bid package document along with your bid form with your sealed bid. Cashiers check, certified check, or Surety Bid Bond for 5% of Base Bid required for all bids over $50,000. Performance, payment, and maintenance bonds will be required by the lowest responsible bidder for any bid over $50,000. These costs are to be included in your bid amount. All questions shall be furnished in writing via email to: Ethan James at ejames@crossland.com

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents