Similar Projects
New Water Treatment System
Term Contract, Alteration
Design
$25,000 to $100,000 est. value
Waldport, OR

Water Filtration System
Renovation
Bidding
$600,000 CJ est. value
Woodburn, OR 97071

Water System Improvements - Phase II - Collector Well No. 3 Pump Station, Booster Pump Station and 1 Million Gallon Reservoir
Infrastructure
Bidding
$9,900,000 CJ est. value
Boardman, OR 97818

Water Treatment Plant Bulk Chemicals FY24
Term Contract
Sub-Bidding
Grants Pass, OR 97526

Miller Road Wellfield Rehabilitation
Renovation
Sub-Bidding
Scappoose, OR 97056

On-Call Emergency and Non-Emergency Routine Plumbing Repair Services
Alteration
Post-Bid
Portland, OR

FMS - Facilities Support: Maintenance and Repair BPA
Term Contract
Post-Bid
$2,500 to $300,000 est. value
Roseburg, OR 97471

Diamond Lake Rescue Building
New Construction, Alteration
Results
Roseburg, OR

Commercial Plumbing Service
Alteration
Results
OR

NW Martin Road - HWY 47 to Verboort Road
Infrastructure
Bidding
$10,000,000 CJ est. value
Forest Grove, OR 97116

Dover North Utility Rehabilitation
Renovation, Infrastructure
Sub-Bidding
$1,100,000 CJ est. value
Beaverton, OR 97005

CB2 at Brewery Blocks 2 Building
Alteration
Post-Bid
Portland, OR

Philomath Water Treatment Plant Improvements, Phase I
Infrastructure
Results
$4,161,000 CJ est. value
Philomath, OR 97370

Shasta 975 Storage Tanks
New Construction, Infrastructure
Bidding
$1,800,000 CJ est. value
Eugene, OR 97405

On-Call Trade Services for Prevailing Wage Projects
Term Contract
Post-Bid
OR

Last Updated 04/03/2023 07:07 PM
Project Title

Emergency Bolts and PRV

Physical Address View project details and contacts
City, State (County) Yachats, OR 97498   (Lincoln County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish All Labor, Equipment and Materials as Required for the Completion of Project Work, Which Consists of Bolt Replacement of Valves at 52 Valve Locations, and Replacement of 2 Existing Pressure Reducing Valve Vaults. The Number of Valves to Be Rehabbed at Each Valve Location Ranges From 1 to 4 Valves. Waterline and Material Testing Will Be Required. Project Will Also Include Excavation, Backfill, Material Compaction, and Other Miscellaneous Items as Required for a Complete Installation. Fittings and Valves, Sitework/Excavating and Grading, Miscellaneous, Construction, Excavation, Waterlines There is no prebid meeting for this project Pre-Qualification: Yes The Project has an expected duration of 120 calendar days.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents