Similar Projects
HVAC Mechanicals Preventative Maintenance - West Bloomfield Library
Alteration
Bidding
West Bloomfield, MI

Donald K. Shine Water Treatment Plant Dehumidification and Coatings Project
Alteration
Bidding
Holland, MI 49424

Fire Exhaust Fans
Post-Bid
Taylor, MI

On-Call General/Emergency Plumbing, Heating, and Air Conditioning Services for 2020 for the LTBB NAHASDA Rental Housing Units
Post-Bid
Harbor Springs, Pellston, Petoskey, MI

Heating, Ventilation and Air Conditioning (HVAC) Equipment and Building Control Systems Maintenance
Results
Less than $142,000 est. value
Wayne, MI

IT Server Room Cooling Unit at the Irwin L. Davis Instructional Center
Results
Flint, MI 48507

HVAC Maintenance and Repair Service
Alteration
Bidding
Highland Park, Livonia, Taylor, Wayne, MI 48180

Washington Woods Air Handling Unit Replacement
Post-Bid
Midland, MI

HVAC Maintenance/Professional Services Contract
Results
Novi, MI

HVAC Revisions – Keidan Special Education Center, Burton Academy, and Davison Annex
Alteration
Bidding
Detroit, MI 48204

Washington Woods Building Chiller Replacement
Post-Bid
Midland, MI

Kinross Correctional Facility HVAC and Boiler Upgrades - Phase 2
Results
Less than $1,346,000 est. value
Kincheloe, MI

HVAC Revisions Noble Elementary Middle School Chrysler Elementary
Alteration
Bidding
Detroit, MI 48238

2020 Kent ISD Lincoln Developmental HRU Repairs
Post-Bid
Grand Rapids, MI

Sault Sainte Marie Tribe of Chippewa Indians - Health Center Evaporative Fluid Cooler Replacement
Results
Less than $196,000 est. value
Sault Sainte Marie, MI

Reported 06/05/2021 12:00 AM
Project Title

N--USCG Sector Sault Ste. Marie A/C Units Replacement

Physical Address View project details and contacts
City, State (County) Sault Sainte Marie, MI   (Chippewa County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

FOB Destination shall be in the Place of Performance. The USCG SILC Base Cleveland requires the following items, Meet or Exceed, to the following: LI 001: Remove and properly dispose of existing two outdoor heat pump units and four indoor wall units. *** please refer to Statement of work***, 1, EA; LI 002: Cost to furnish and install two 20,000 BTU heat pump/ A/C outdoor units, 2, ea; LI 003: Cost to furnish and install three ¾-ton indoor ?wall units for three single offices, 3, ea; LI 004: Cost to furnish and install one 1-ton indoor wall unit for the remaining office., 1, EA; LI 005: Cost to install new lineset in place of existing lines in same locations., 6, EA; LI 006: Cost to include wireless thermostats for each unit, installation of condensate removal ?system for each unit, condenser pads and all electrical connections and refrigerant for each unit., 6, EA; LI 007: Cost to fully install all units refrigerant lines, electrical systems, condensate ?systems and charge with refrigerant to make units ready for use., 1, EA; LI 008: Cost for Crane operation, permits and licensed personnel., 1, EA;

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents