Similar Projects
Vehicle Gate Electrical Power
Alteration
Results
Vancouver, WA 98661

Bellevue Library Elevator Modernization for Car #3
Alteration
Results
Bellevue, WA 98007

Mulch, Bark and Wood
Alteration
Bidding
WA 98201

51st Circle Generator Purchase and Installation
Alteration
Post-Bid
$500,000 to $550,000 est. value
Vancouver, WA 98661

Prequalifying Contractors for Construction Work for 2022
Infrastructure
Post-Bid
WA 98206

Distribution Wood Pole Replacements
Renovation
Bidding
WA

Bellingham International Airport Replace Apron Lighting Project
Infrastructure
Results
Bellingham, WA 98225

Lakeland Hills Pump Station Generator Install
Renovation, Alteration
Results
$1,190,000 est. value
Auburn, WA 98092

Fisherman's Harbor Commercial Development Parcels A8 & A17
New Construction, Infrastructure, Alteration
Results
$4,300,000 to $4,700,000 est. value
Everett, WA 98213

Tree Pruning and Removal
Alteration
Post-Bid
$2,500,000 est. value
Vancouver, WA 98687

115Kv Transmission Steel Poles and Caissons for North Stanwood Camano Island Project
Infrastructure
Bidding
Stanwood, WA 98292

North & South Monument Site Development
New Construction, Infrastructure, Alteration
Results
Bremerton, WA

North & South Monument Site Development
New Construction, Infrastructure, Alteration
Results
Bremerton, WA

Deception Creek Line Extension
Infrastructure
Bidding
$2,235,825 est. value
WA

Last Updated 09/07/2021 01:21 PM
Project Title

Woods Creek - Circuits 12-1808 & 12-1811 - Distribution and Transmission Line Clearance

Physical Address View project details and contacts
City, State (County) Monroe, WA 98272   (Snohomish County)
Category(s) Single Trades
Sub-Category(s) Electric, Landscaping/Irrigation
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $900,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This contract work consists of providing all labor, materials and equipment necessary to trim, cut, treat, remove, clear, and dispose of trees and brush, as well as perform application of herbicides under and along approximately 67 pole miles of the District’s Distribution and Transmission System. Work location is in the vicinity of Monroe, Snohomish County, Washington. The specific work location commences at Woods Creek Substation and goes North on Woods Creek Road, Ingraham Road, Wagner Road, Yeager Road and Bollenbaugh Hill Road. The line goes East on Old Owen Road, Florence Acres Road, and Calhoun Road.

Details

Division 26 - Electrical.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents