Last Updated | 12/01/2021 10:05 AM |
Project Title | Mill Pond Water Treatment Plant PFAS Treatment Upgrades Contract 1 – Pipe Coring, Connections and Valves |
Physical Address | View project details and contacts |
City, State (County) | Burlington, MA (Middlesex County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $275,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Installation of pipe stubs and valves through portions of the structure of the existing Mill Pond water treatment plant. Excavation is required to expose walls where cores are proposed through which pipe stubs will be installed. Coring will be through concrete and rebar within the existing filter channel, clearwell, and waste tank and installing ductile iron pipe stubs for future connections to a PFAS Treatment Building (to be constructed under a separate contract). This project will also includes insertion valves, exploratory test pitting, and installation of erosion control measures, and management of soils excavated as part of the work. |
||||||
Details | Water Treatment Plant, Renovation.
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |