Similar Projects
Beaver Dam Library Improvements
Renovation
Conception
Beaver Dam, WI 53916

New East Branch Library
New Construction
Conception
Green Bay, WI 54302

Appleton Public Library
Renovation, Addition - 120,000 SF
Design
$26,400,000 est. value
Appleton, WI 54911

Library - Village of Oregon
New Construction
Design
$10,000,000 est. value
Oregon, WI

LE Phillips Memorial Library
Renovation, Addition
Post-Bid
Eau Claire, WI

Monona Public Library
Renovation
Post-Bid
Madison, WI

McMillan Memorial Library
Renovation
Results
$1,500,000 est. value
Wisconsin Rapids, WI 54494

Waukesha Public Library
Renovation, Addition
Results
Waukesha, WI 53186

Brown Deer Road Redevelopment
New Construction
Pending Verification
$84,000,000 est. value
Bayside, WI 53217

Library Expansion - Deerfield Public Library
Addition, Renovation - 7,900 SF
Pending Verification
$3,100,000 CJ est. value
Deerfield, WI 53531

Sun Prairie Public Library
Renovation, Addition - 28,900 SF
Conception
$20,000,000 est. value
Sun Prairie, WI 53590

Le Phillips Library - Bp04 Drapery And Track
Renovation, Alteration
Post-Bid
Eau Claire, WI 54701

Wausaukee Library and Community Center
New Construction
Results
Wausaukee, WI

Central Library Improvements - 17036
Renovation
Conception
Less than $1,000,000 est. value
Madison, WI 53703

Appleton Public Library CM at Risk RFP
Renovation
Results
Appleton, WI 54911

Last Updated 07/28/2022 12:08 PM
Project Title

Brown County Central Library - Flexible Meeting Room Renovation

Physical Address View project details and contacts
City, State (County) Green Bay, WI 54301   (Brown County)
Category(s) Government/Public
Sub-Category(s) Library - Public
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $125,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project Summary: Project consists of renovation for a flexible meeting room and ancillary spaces in the lower level of the Brown County Central Library building described within the scope of the Contract Documents. 1. Work Included: Provide labor, materials, articles, equipment, incidentals, items, tools, services, supplies, methods, operations, skills in such quantities as may be necessary to complete Project within intent of Contract Documents. 2. Singular notations shall be considered plural where plural application is reasonably inferable. Mention or indication of extent of work under work division or specification section is done only for convenience of Contractor and shall not be construed as describing all work required under that Division or Section.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Roof and Deck Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Library Equipment, Library Stack Systems, Audio-Visual Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Furniture, Institutional Furniture, Library Furniture, Book Shelves, Study Carrels, Index Card File Cabinets, Portable Audience Seating, Seat and Table Assemblies.
Division 13 - Special Construction.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents