Similar Projects
McDowell Dam Bank Stabilization 2021
Results
$106,000 est. value
Bismarck, ND

Red River Structure - FMM Area Flood Risk Management
Design
$100,000,000 to $250,000,000 est. value
Fargo, ND

Jamestown Dam Outlet Works Stilling Basin Concrete Floor Repairs
Design
$500,000 to $1,000,000 est. value
Jamestown, ND

Pipestem Dam Spillway Modifications
Renovation, Term Contract
Post-Bid
$100,000,000 to $250,000,000 est. value
Jamestown, ND 58401

Last Updated 10/05/2021 11:14 AM
Project Title

P--Bone Hill NWR - Dam Breach Construction

Physical Address View project details and contacts
City, State (County) ND   (LaMoure County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bone Hill Dam Breach, Kulm NWR, Kulm, Lamoure County, North Dakota: Contractor shall provide all material, equipment, labor and supervision to remove the Bone Hill Dam, which is a low hazard-potential dam owned and operated by U.S. Fish and Wildlife Services - The dam is located on a small tributary of Bone Hill Creek that flows into the James River. The dam was given an overall safety classification as poor due to the numerous dam deficiencies. This project will breach the dam and remove the dam from the FWS inventory and restore the creek to its historical flows.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents