Similar Projects
Reported | 04/24/2021 12:00 AM |
Project Title | Building 12 and Building 15 Furniture Design and Installation |
Physical Address | View project details and contacts |
City, State (County) | Picatinny Arsenal, NJ (Morris County) |
Category(s) | Single Trades |
Sub-Category(s) | Furnishings |
Contracting Method | Competitive Bids. |
Project Status | Accepting Letters of Interest |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The United States Army Contracting Command – NJ, on behalf of the US Army Combat Capabilities Development Command Armements Center (CCDC AC) Systems Engineering Directorate (SED) at Picatinny Arsenal, NJ is issuing this sources sought synopsis as a means of conducting market research to identify potential sources having an interest and capabilities available to support/provide the renovation of Building 12’s furniture in its conference rooms and System Analysis labs. The new layout would be designed and outfitted as an efficient space to accommodate additional employees and offices. In total, SED is looking to populate Building 12 conference rooms and System Analysis lab with furniture, customized for the needs of each space. A contractor that specializes in office furniture is required to both source and install these items, as well as provide ancillary parts and/or equipment. This effort will also provide sufficient seating and table space to accommodate the workforce in Building 15. Picatinny Arsenal’s Building 12 is home to three branches of Enterprise Systems Integration Center (ESIC): Product Data Management (PDM), Requirements/Functional Analysis and Design Synthesis (RFAD) and Systems Analysis Division (SAD). In an effort to update and facilitate constructive working relationships, the conference rooms and System Analysis Lab in Building 12 will need to be updated with new furniture and tables. The US Army, Systems Engineering Directorate (SED), at Picatinny Arsenal, NJ requires furniture for a newly constructed facility called the Joint Computer Aided System Integration & Innovation Laboratory Environment (JCASI2LE) or Building 15. This facility will provide the workforce with a rich and immersive collaborative environment that will enable employees to share and integrate data across engineering disciplines. Furniture is required for building 15 so that employees will have sufficient seating and table space to perform the necessary work functions such as collaboration amongst teams and the presentation of information to the workforce. Both Building 12 and Building 15 are adjacent buildings that will be physically connected to each other through a shared hallway. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |