Similar Projects
RunWay 5-23 Obstruction Removal and Extend RunWay 5 - 380067 - City of Frederick
Infrastructure, Alteration
Conception
$9,700,000 est. value
Frederick, MD 21701

Route 40 and LR Dingle Booster Pump Stations Rehabilitation - 360036 - City of Frederick
Renovation
Conception
$2,500,000 est. value
Frederick, MD 21709

Mill Creek Subdivision
New Construction
Design
Frederick, MD

Biggs Ford Road Solar Center
New Construction, Infrastructure
Design
$24,000,000 CJ est. value
Walkersville, MD 21793

Replacing Interior Sanitary Sewer Lines
Infrastructure
Bidding
$100,000 CJ est. value
Frederick, MD 21701

D/B Medical Waste Incinerator Facility at Ft. Detrick - Phase 2
New Construction, Infrastructure, Renovation
Bidding
$100,000,000 CJ est. value
Frederick, MD 21702

The Residences at Railroad Square
New Construction, Infrastructure - 72,776 SF
Sub-Bidding
$15,000,000 CJ est. value
Brunswick, MD 21716

Downtown Frederick Marriott Hotel and Conference Center
LEED Certification, New Construction, Infrastructure - 24,000 SF
Post-Bid
$64,000,000 CJ est. value
Frederick, MD 21701

Green Valley Elementary and Valley Elementary Schools
New Construction, Renovation, Infrastructure
Post-Bid
$80,000,000 CJ est. value
Frederick, MD 21701

Ballenger Mckinney Influent Pumping Station Modifications
New Construction
Results
Frederick, MD 21704

Frederick County Adult Detention Center Phase IV - Medical Center Expansion
Addition, Infrastructure - 15,000 SF
Results
$10,667,835 CJ est. value
Frederick, MD 21704

Monocacy Manor
New Construction, Infrastructure
Construction
$81,000,000 CJ est. value
Frederick, MD 21701

Trail Capping Contract Rails-to-Trails West of Main Street
Infrastructure
Construction
$517,022 CJ est. value
Mount Airy, MD 21771

Linden Avenue Senior Apartments
New Construction, Infrastructure
Pending Verification
$22,000,000 CJ est. value
Frederick, MD 21703

Highland Trail
New Construction, Infrastructure - 15,000 SF
Pending Verification
$208,000,000 CJ est. value
Frederick, MD 21704

Last Updated 05/15/2023 09:04 AM
Project Title

New Creamery Road Sewage Pump Station

Physical Address View project details and contacts
City, State (County) Emmitsburg, MD 21727   (Frederick County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $4,391,422 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

New Creamery Road Sewage Pump Station - 001 The Project includes the following Work: Furnishing all labor, materials, equipment and performance of work for construction of the New Creamery Road Sewage Pump Station. Bids are requested for the following Contract: New Creamery Road Sewage Pump Station/001. Instructions to Bidders. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. American Iron and Steel Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All iron and steel products used in this project must be produced in the United States. The term "iron and steel products" means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and Construction Materials. The following waivers apply to this Contract: De Minimis, Minor Components, Pig iron and direct reduced iron The Town of Emmitsburg reserves the right to accept or reject any and/or all bids and to waive any informalities or irregularities in the bidding process. The Town of Emmitsburg does not discriminate based on race, color, national origin, sex, sexual orientation, religion, age and disability in employment or the provision of services. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents