Similar Projects
J045--Annual RPZ Backflow Preventer Testing - MPLS
Term Contract
Bidding
Minneapolis, MN 55417

Electric Distribution Improvements - Pole Replacement
Alteration
Bidding
$400,000 est. value
Mora, MN

OWEF - Boilers Comprehensive Ultrasonic Thickness Testing
Term Contract
Post-Bid
Rochester, MN 55904

Health and Human Services Building Generator Addition
Post-Bid
Red Wing, MN

Zachary Lane Elementary School - 2021 LTFM
Renovation
Results
Less than $1,200,000 est. value
Minneapolis, MN 55442

Sauk Rapids Rice HS Lighting Upgrades
Results
Sauk Rapids, MN 56379

Priam Substation Modifications
Alteration
Bidding
$250,000 est. value
Kandiyohi, MN

Switchgear Maintenance at Retirement Building
Term Contract
Post-Bid
Less than $15,000 est. value
Saint Paul, MN 55103

059--Uninterrupted Power Supply (UPS) Service and Maintenance
Results
Minneapolis, MN

LED Lighting Upgrade at Oxford Community and Jimmy Lee Recreation Centers
Alteration
Bidding
Saint Paul, MN 55104

Energy Services
Post-Bid
Long Lake, MN

Steam Boiler Replacement at MCF Red Wing
Results
Less than $1,963,759 est. value
Red Wing, MN 55066

Blue Line LRT 32nd Street Crossover Switch Heater Replacement
Infrastructure
Bidding
Minneapolis, MN

DNR R4 Banning SP EV Charging Station
Post-Bid
Sandstone, MN

Replacement Emergency Generator for Kenny School and Olson School
Results
Minneapolis, MN 55419

Last Updated 07/06/2021 12:45 PM
Project Title

Moose Lake Truck Station Campus - Electrical and Mechanical

Physical Address View project details and contacts
City, State (County) Moose Lake, MN 55767   (Carlton County)
Category(s) Single Trades
Sub-Category(s) Electric, Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A. The work will done under one prime contract that includes: General, Civil, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1.) Pavement removal and site re-grading. 2.) Demolition of existing truck station main building and storage garage. 3.) Construction of new Truck Station Building No. 90205. 4.) Installation of site utilities, new water service, and sanitary sewer line replacement. 5.) Bituminous paving. 6.) Turf establishment. Targeted Group:7%

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents