Similar Projects
Last Updated | 11/10/2020 12:26 PM |
Project Title | Lift Station No. 3 and 4 Rehabilitation and Pump Replacement |
Physical Address | View project details and contacts |
City, State (County) | Spring, TX 77379 (Harris County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Pumps and Wells |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Scope of Work of the Contract includes the following: Rehabilitation of Lift Station No. 3 & No. 4, including but not limited to the removal and replacement of all submersible pumps for each lift station and related items; removal and replacement of the control panel for lift station no. 4; removal and replacement of all three (3) check valves for lift station no. 3; blasting and recoating of piping; Installation of a canopy over electrical equipment at each lift station; rehabilitation of wet well for lift station no. 4; Bypass pumping; and miscellaneous civil and electrical items as specified in the construction drawings and project manual. |
||||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |