Similar Projects
Thomas Jefferson Middle School Chiller Replacement and Flint Lake Elementary School Air Handling Units Replacement and Related Work
Alteration
Bidding
$400,000 est. value
Valparaiso, IN 46383

Indianapolis Public Schools Temperature Controls - Package 3
Alteration
Bidding
$2,000,000 est. value
Indianapolis, IN

Purdue University Airport HVAC Replacement
Post-Bid
Less than $3,000,000 est. value
West Lafayette, IN 47907

Janitorial, Maintenance and HVAC Maintenance
Term Contract
Post-Bid
Jeffersonville, IN 47130

Phase 2 - Mini Splits HVAC Equipment Replacement at Meadow Wood Apartments
Results
$120,000 to $130,000 est. value
Charlestown, IN 47111

North Ventilation System Replacement
Results
Less than $150,000 est. value
Edinburgh, IN 46124

Air Handler Replacement Pike Central Middle School
Post-Bid
Petersburg, IN

Hancock County Court-House Annex Chiller Replacement
Results
Greenfield, IN 46140

Heat Pump Replacement
Post-Bid
North Vernon, IN 47265

Bl579 Data Center Rm 143 Cooling System Relocation
Results
Bloomington, IN 47408

IMC CEP - Emissions Monitoring Cabinets
Post-Bid
Indianapolis, IN

IN072 ENG Science and Technology Replace AHU 1W
Results
Indianapolis, IN

Rooftop Unit Replacements
Post-Bid
South Bend, IN 46601

BL608 Mesh - Decommission HVAC Equipment
Results
Bloomington, IN 47408

Lincoln Center Fieldhouse - Rooftop HVAC Unit Replacement
Post-Bid
Highland, IN 47854

Reported 05/16/2022 08:05 AM
Project Title

Overhaul/Refurbishment of Fluid Coolers (Heat Exchangers)

Physical Address View project details and contacts
City, State (County) Crane, IN 47522   (Martin County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

3.3.3.1.Level: ”MINIMUM REFURBISHMENT” (CLIN 0002) - Consisting of: a. Removing tube bundle b. Clean tube sheets and baffles c. Replace seals and gaskets d. Replace Anodes and gaskets e. Evaluate Drain Plug material. Ensure Drain Plug is a non-ferrous material; replace Drain Plug and Gasket as necessary f. Align Vent Tubes to the dimensions and appearance as per Drawing 855494 g. Pressure test Fluid Cooler to drawing specification h. Blast all surfaces to be painted using best industry practices to ensure paint adhesion i. Blast Nameplate from unit j. Wash the blasted unit with cleaning solution or equivalent using best industry practices k. Mask all areas not to be painted and place paper or other acceptable material on the openings of the unit to prevent the painting of the interior surfaces of the unit l. Use the Ameron paint system, Amerlock 2 for primer and PSX 700A for paint m. Primer Ameron Amerlock 2 - final maximum dry film thickness is not to exceed 10 mils n. Pot life for primer is one (1) hour at 70°F but can be extended by thinning with Amercoat 8, 65, or other manufacturer suggested thinner to 25% maximum o. Maximum re-coat not to exceed one (1) month Minimum recoat time is three (3) hours at 70°F p. Paint Ameron PSX 700 A - final maximum dry film thickness is not to exceed 10 mils q. Pot life for paint is four (4) hours at 70°F but can be extended by thinning with Amercoat 65, 70, or other manufacturer suggested thinner to 125% maximum r. There is no maximum re-coat time although the minimum recoat time is four and half (45) hours at 70°F s. Install Government provided Fluid Cooler Nameplate as per Drawing 296-1317 t. Remove all masking and material used during the repainting of the units 3.3.3.2.Level: ”MODERATE REFURBISHMENT” (CLIN 0003) - Consisting of: a. Perform a MINIMUM REFURBISHMENT b. Reassemble with new tubes. Perform a hydrostatic test of tube side of heat exchanger, plugged or replace up to 10% c. Replace baffles and tie rods, and/or weep drains, and/or rework flanges d. Apply coating to the inlet and outlet of the tube sheets 3.3.3.3.Level: ”MAJOR REFURBISHMENT” (CLIN 0004) - Consisting of: a. Perform MINIMUM REFURBISHMENT b. Perform MODERATE REFURBISHMENT c. Furnish and install new tubes and both tube sheets

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Heat Exchangers for HVAC, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents