Last Updated | 08/24/2022 08:02 PM |
Project Title | Septic Elimination Project - East Tippecanoe Lake Wastewater Collection System - Contract C |
Physical Address | View project details and contacts |
City, State (County) | Leesburg, IN 46538 (Kosciusko County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $11,253,814 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of August 24, 2022, this project was awarded to Selge Construction for $11,253,814.09. Tippecanoe and Chapman Regional Sewer District located in Kosciusko County, Indiana, hereinafter referred to as the "Owner" or "District", will receive sealed proposals for the construction of a septic elimination project as follows: Contract A - Chapman Lakes Wastewater Collection System Contract B - West Tippecanoe Lake Wastewater Collection System Contract C - East Tippecanoe Lake Wastewater Collection System Any contract awarded under this Advertisement for Bids is expected to be funded by the United States Department of Agriculture - Rural Development ("USDA-RD") and Indiana Finance Authority State Revolving Fund ("SRF"). Neither the United States nor any of its departments, agencies or employees is or will be a party to this Advertisement for Bids or any resulting contract. Contract C - East Tippecanoe Lake Wastewater Collection System o Construction of one (1) wastewater pump stations and associated components such as generators, chemical feed systems, site work, electrical and instrumentation and flow meters. o Installation of approximately 90,000 linear feet of 1-1/4" through 8" pressure sewers, force main and associated components, such as isolation valves, flushing stations, and air release valve stations. o Installation of approximately 326 grinder pump stations and associated components such as grinder station control panels, curb stop check valve assemblies, electrical risers and electrical conduits/conductors. The Owner reserves the right to reject any proposal for being unresponsive or deemed irresponsible, reject all proposals, or to accept the lowest responsive and responsible proposal/Bidder. Any proposal may be withdrawn prior to the above scheduled time for the opening of proposals or authorized postponement thereof. Any proposal received after the time and date specified shall not be considered. No proposal may be withdrawn afterthe scheduled closing time forreceipt of bidsfor at least one hundred fifty (150) days while final project approvals are acquired from the USDA-RD and IFA SRF Wage rates on the project shall not be less than the Federal Davis-Bacon wage scale published by the U.S. Department of Labor. The most recently issued wage scale determination published prior to the date of Bid opening shall be the final applicable wage determination for the Project. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |