Similar Projects
Repair Water Intrusion B400
Alteration
Design
$2,000,000 to $5,000,000 est. value
Tomah, WI 54660

Multi-Building Roof Replacement
Alteration
Bidding
$890,000 est. value
Stevens Point, WI 54481

Food Service Roof Replacement
Alteration
Bidding
$470,000 est. value
Allouez, Green Bay, WI 54301

Demolition of Existing Flat Roof/Ceiling
Post-Bid
Gays Mills, WI

Remodeling and Repairs at 4042 N 64th Street
Renovation
Post-Bid
Milwaukee, WI 53216

Maintenance Shop 8 Roof Repair
Results
Less than $186,500 est. value
Whitewater, WI

KI Convention Center Skylight Replacement
Results
Green Bay, WI 54301

Sports Activity Center Roof Areas 1 & 3 Replacement
Alteration
Bidding
$485,000 est. value
Kenosha, WI 53144

Roofing Repair and Maintenance
Post-Bid

Craig Center Roof Retrofit at the Rock County Fairgrounds
Results
$80,000 est. value
Janesville, WI 53545

Fond Du Lac Transportation Building Roof Replacement
Alteration
Bidding
Milwaukee, WI 53210

Courthouse South Penthouse Roof Replacement
Post-Bid
Wausau, WI 54403

Winneconne WWTF Roof Improvements
Results
Winneconne, WI 54986

MCTS KK Garage Bus Storage Building Roof Replacement
Alteration
Bidding
Milwaukee, WI 53204

UW Heating Plant Roof Replacement
Post-Bid
Wausau, WI 54401

Last Updated 02/08/2022 03:15 PM
Project Title

Roof Replacement - Andersen Hall and Green Hill Center of the Arts MEP

Physical Address View project details and contacts
City, State (County) Whitewater, WI 53190   (Walworth County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,900,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general the work consists of removal of approximately 79,000 square feet of existing roof system, related flashings, and existing insulation down to the structural roof deck at designated portions of Andersen Hall and the Center of the Arts buildings. New insulation and fully-adhered EPDM roof system shall be installed atop the prepared roof deck. Designated roof drains shall be replaced and/or modified in conjunction with the roof replacement. Secondary drainage will be added to portions of both buildings an additional primary roof drain will be added to Andersen Library. Due to the size of the roof replacements, construction will occur over two consecutive summers.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents