Similar Projects
Last Updated | 03/23/2023 03:12 PM |
Project Title | RFQ Construction Manager - Interior Office Tenant Improvement, Capital Building, Legislative Services Office, Boise, Idaho |
Physical Address | View project details and contacts |
City, State (County) | Boise, ID 83720 (Ada County) |
Category(s) | Government/Public |
Sub-Category(s) | Misc. Buildings |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Request for Qualifications, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $5,800,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of March 23 the project was awarded to ACM but the contract is still be negotiated. The project scope of work includes two phases building on the initial programming and conceptual design effort completed in 2019. Phase 1 is to design an office tenant improvement within 5,200 sf of the first floor of the Idaho State Capitol Building. Phase 2 is to design an office tenant improvement within 7,200 sf of the Garden Level. Specifically, work will include the demolition of existing cubicles, offices, and other related spaces; the construction of new offices and related spaces with updated finishes to match the existing finishes in the historic capitol; and upgrades to mechanical, plumbing, fire sprinkler, electrical, security/access, and telecomm to accommodate the new layout. All questions must be sent to the DPW Project Manager: Lindsay Erb, Project Manager Division of Public Works 502 N. 4th St. PO Box 83720 Boise ID 83720-0072 (208) 332-1911 Lindsay.erb@admidaho.gov A total project budget has been established at $6,800,000.00 and includes fees (A/E and CM/GC), commissioning services, contingencies, tests, and other project related expenses. A construction budget has been set at $5,800,000.00 for phase I and phase 2. A complete construction cost estimate and construction schedule will be required following CM/GC ' s review of the Design Development set of drawings and must be updated throughout the construction documents process. At the time of submittal the CM/GC will be required to meet as needed, but not less than twice a month, with the Owner and DPW for the purpose of providing a report regarding the previous month's progress. Such meetings will: advise the team of projected project cost and related value engineering if needed; include critical path schedules, show funds expended in the completion of the project and specific accomplishments related to the completion of the project. The CMIGC shall be licensed as a Public Works Construction Manager and as a Public Works Licensed General Contractor by the State of Idaho. Finns proposing for these services shall hold and maintain a certificate of authority for providing construction management services. The CM/GC will be required to upload all documents to DPW's Owner's web-based project management system, Projectmates. Documents may include, but are not limited to meeting minutes, sketches, diagrams, programming analysis, photographs relevant to the project, submittals, field reports, schedules, cost estimates, RFI's, close out documents, warranties, etc. The CMIGC in conjunction with the design team shall keep in mind that during all phases, code compliance, energy efficiency, and building maintenance concerns should be incorporated into the design. The CM/GC will be required to provide payment and performance bond or bonds in the amount of the total construction management contract. |
||||||||||||||||||||||||||||||||
Details | 1 Story Above Grade, 12,400 SF.
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |