Similar Projects
Veazy Park Apartments
New Construction, Demolition - 58,500 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Boise, ID 83706

Asbestos Abatement Design Services
Term Contract, Demolition, Infrastructure
Conception
$500,000 CJ est. value
Boise, ID 83702

Lewiston Regional Office Facility Improvements - Phase II
New Construction, Infrastructure, Renovation
Design
$1,000,000 CJ est. value
Boise, ID 83702

Julia Davis River Node Memorial Construction
Infrastructure
Design
$600,000 CJ est. value
Boise, ID 83702

Ada County 400 Benjamin York Roof Top Unit (RTU) Replacement 2023
Renovation
Bidding
$218,000 CJ est. value
Boise, ID 83704

Design Build MATOC
New Construction, Renovation
Post-Bid
$99,900,000 est. value
Boise, Orofino, ID - Colton, Lacrosse, Pasco, Plymouth, Walla Walla, WA 99346

Eastern Service Center (ESC) Multiple Award Task Order Contract (MATOC) Replacement
New Construction, Renovation, Term Contract
Post-Bid
Less than $50,000,000 est. value
Boise, ID - Richland, Spokane, Yakima, WA

Boise Parks and Recreation Maintenance Buildings
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Boise, ID 83709

Intermountain Bird Observatory, Boise River
New Construction, Infrastructure
Design
$350,000 CJ est. value
Boise, ID 83712

Rapid Response Single Award Task Order Contract (SATOC)
New Construction
Post-Bid
Less than $95,000,000 est. value

Hazardous Waste Disposal
Term Contract
Post-Bid
Boise, ID 83702

Ada County Grounds Maintenance for Select Ada County Facilities 2022
Term Contract
Post-Bid
Boise, ID 83702

RFP CM/GC - Miscellaneous Minor Construction
Term Contract
Post-Bid
Boise, ID 83702

Mayor's Department Tenant Improvement
Renovation
Post-Bid
$600,000 est. value
Meridian, ID 83642

RFQ D/B - Chinden Campus - Building 3 Renovations
Build-out - 320,000 SF
Post-Bid
$20,000,000 CJ est. value
Boise, ID 83714

Last Updated 03/23/2023 03:12 PM
Project Title

RFQ Construction Manager - Interior Office Tenant Improvement, Capital Building, Legislative Services Office, Boise, Idaho

Physical Address View project details and contacts
City, State (County) Boise, ID 83720   (Ada County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $5,800,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 23 the project was awarded to ACM but the contract is still be negotiated. The project scope of work includes two phases building on the initial programming and conceptual design effort completed in 2019. Phase 1 is to design an office tenant improvement within 5,200 sf of the first floor of the Idaho State Capitol Building. Phase 2 is to design an office tenant improvement within 7,200 sf of the Garden Level. Specifically, work will include the demolition of existing cubicles, offices, and other related spaces; the construction of new offices and related spaces with updated finishes to match the existing finishes in the historic capitol; and upgrades to mechanical, plumbing, fire sprinkler, electrical, security/access, and telecomm to accommodate the new layout. All questions must be sent to the DPW Project Manager: Lindsay Erb, Project Manager Division of Public Works 502 N. 4th St. PO Box 83720 Boise ID 83720-0072 (208) 332-1911 Lindsay.erb@admidaho.gov A total project budget has been established at $6,800,000.00 and includes fees (A/E and CM/GC), commissioning services, contingencies, tests, and other project related expenses. A construction budget has been set at $5,800,000.00 for phase I and phase 2. A complete construction cost estimate and construction schedule will be required following CM/GC ' s review of the Design Development set of drawings and must be updated throughout the construction documents process. At the time of submittal the CM/GC will be required to meet as needed, but not less than twice a month, with the Owner and DPW for the purpose of providing a report regarding the previous month's progress. Such meetings will: advise the team of projected project cost and related value engineering if needed; include critical path schedules, show funds expended in the completion of the project and specific accomplishments related to the completion of the project. The CMIGC shall be licensed as a Public Works Construction Manager and as a Public Works Licensed General Contractor by the State of Idaho. Finns proposing for these services shall hold and maintain a certificate of authority for providing construction management services. The CM/GC will be required to upload all documents to DPW's Owner's web-based project management system, Projectmates. Documents may include, but are not limited to meeting minutes, sketches, diagrams, programming analysis, photographs relevant to the project, submittals, field reports, schedules, cost estimates, RFI's, close out documents, warranties, etc. The CMIGC in conjunction with the design team shall keep in mind that during all phases, code compliance, energy efficiency, and building maintenance concerns should be incorporated into the design. The CM/GC will be required to provide payment and performance bond or bonds in the amount of the total construction management contract.

Details

1 Story Above Grade, 12,400 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents