Similar Projects
New Fire Department Headquarters
New Construction
Conception
McKinney, TX

Fire Station #7
New Construction
Conception
$7,100,000 est. value
College Station, TX

Fire Station 2
New Construction
Design
$4,500,000 est. value
Humble, TX 77338

New Law Enforcement Center
Addition
Design
Mansfield, TX 76063

Fire Station 6
New Construction - 20,974 SF
Bidding
$12,000,000 est. value
Allen, TX 75013

CMAR Lewisville Public Safety Complex
New Construction - 116,000 SF
Bidding
$65,000,000 est. value
Lewisville, TX 75077

New Public Safety Training Center
New Construction
Post-Bid
Less than $7,000,000 est. value
Texas City, TX

Haltom City Fire Station 3
New Construction
Post-Bid
Haltom City, TX 76117

Construction Manager at Risk Services for Police Headquarters Project
New Construction - 64,000 SF
Results
$25,000,000 est. value
Kyle, TX 78640

Fire Station No. 3 Renovations
Renovation - 1,150 SF
Results
Kilgore, TX 75662

Fire Station 6
Construction
League City, TX

Aldine Fire Rescue Station No. 11
New Construction - 15,185 SF
Construction
Houston, TX 77032

Emergency Operations Center
Renovation
Pending Verification
Killeen, TX 76541

Station 5 Bay Remodel
Renovation
Pending Verification
Killeen, TX 76542

Fire Station 1 Remodel
Renovation
Conception
$2,000,000 est. value
San Marcos, TX 78666

Last Updated 01/28/2022 08:26 AM
Project Title

Fire Station 19 Building Renovations

Physical Address View project details and contacts
City, State (County) El Paso, TX 79925   (El Paso County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,550,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The existing Fire Station No. 19 located at 2405 McRae Boulevard will undergo a renovation to include partial building demolition, interior demolition, and a new addition to comply with new fire station standards. Approximately 450 SF of the existing building will be demolished to allow for a new building addition to accommodate locker room, 4 restrooms with showers, exercise room, bunker gear room, and EMS supply and extractor room. In order to create fluidity through the fire station, we are proposing that all interior walls, plumbing fixtures, casework, ceiling, floors, doors, windows, etc. be removed. Leave only the shell of the building and its structural bearing walls. The renovation will include a new dispatch office, kitchen, living room, restrooms, officer’s dormitory, lockers, showers, fitness area, bunker gear, janitor closet, decontamination room, EMS supply closet, extractor room, and new overhead bay doors. New plumbing system connection, new mechanical units, new light fixtures, data/communication, and a 20 year warranty roofing system.

Details

450 SF - Fire/Police Station, 450 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents