Similar Projects
Stilling Basins
Infrastructure
Bidding
$900,000 est. value
Green Mountain Falls, CO 80819

Cottonwood Creek Channel Rehabilitation Reach 1 and Reach 1B
Infrastructure
Bidding
$4,000,000 to $5,000,000 est. value
Colorado Springs, CO

Manitou Springs Creekwalk Trail Phases 4 and 5 Survey, Row and Design
Post-Bid
Manitou Springs, CO

Flying Horse Pond 1 Retrofit
Infrastructure
Post-Bid
Colorado Springs, CO

Sand Creek Downstream of East Fork Confluence Stream Stabilization
Results
CO

Pikes Peak Greenway Trail Improvements - I25 To Cottonwood
Results
Colorado Springs, CO

Flying Horse Detention Pond 1 Retrofit CM and Geotechnical Engineering Services
Infrastructure
Post-Bid
Colorado Springs, CO

Monument Creek at Talemine Project
Results
$1,000,000 to $1,500,000 est. value
Colorado Springs, CO

Sidewalk and Drainage Improvements on El Monte Place
Infrastructure
Post-Bid
Manitou Springs, CO 80829

Homestake Surge Pond Rehabilitation Project
Results
CO

Black Squirrel Creek Restoration U.S. Air Force Academy
Infrastructure
Post-Bid
USAF Academy, CO 80840

Clear Spring Ranch Facility Drainage Improvements
Alteration
Results
$400,000 to $450,000 est. value
Colorado Springs, CO

North Douglas Creek Channel Restoration
Infrastructure
Post-Bid
$350,000 est. value
Colorado Springs, CO

Slip line and Extend Culvert
Infrastructure
Results
Less than $1,000,000 est. value

Black Squirrel Creek Drainage Improvements
Infrastructure
Results
Colorado Springs, CO

Last Updated 05/24/2022 05:08 AM
Project Title

2022 Cured in Place Pipe

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO   (El Paso County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $900,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To perform a program for installation of Cured In Place Pipe (CIPP) in areas throughout the District in 2022.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents