Similar Projects
Shaver Road Bridge and Floodwall, Phase 3
Conception
$2,500,000 est. value
Cedar Rapids, IA

Edgewood Road Trail Phase 2B - Bridge Modifications and Trail
Conception
$4,060,000 est. value
Cedar Rapids, IA 52407

Bridge Replacement - PPCB
New Construction, Infrastructure
Bidding
IA

L-Bridge
New Construction, Infrastructure
Bidding
IA

Camp Dodge Training Area Bridge Replacement
Renovation
Post-Bid
Johnston, IA

Bridge Deck Overlay
New Construction, Infrastructure
Post-Bid
IA

West Des Moines Digital Enterprise Segment 5-3 Raccoon River Crossing
New Construction
Results
West Des Moines, IA

J Street SW Bridge Over Prairie Creek Repairs
New Construction
Results
$25,000 est. value
Cedar Rapids, IA 52404

Shaver Road Bridge and Floodwall, Phase 4
Conception
$1,500,000 est. value
Cedar Rapids, IA 52402

Bridge Deck Overlay
New Construction, Infrastructure
Bidding
IA

Bridge Replacement - PPCB
New Construction, Infrastructure
Post-Bid
IA

Bridge Replacement with Twin RCB - BR 1270
New Construction
Results
Less than $375,000 est. value
Polk City, IA

Bridge Replacement - CCS
New Construction, Infrastructure
Bidding
IA

Bridge Replacement - CCS
New Construction, Infrastructure
Post-Bid
IA

2021 Bridge Repair
Renovation, Infrastructure
Results
Webster City, IA 50595

Last Updated 12/22/2021 03:17 AM
Project Title

Bridge Approach Repair

Physical Address View project details and contacts
City, State (County) IA   (Johnson County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Route: u.s. 218 Rohret Rd 1.1 Mi n Of Ia 1 8.60 Ton Asphalt Binder 1,664.40 Square Yard Hot Mix Asphalt 15.50 Cubic Yard Modified Subbase 166.60 Square Yard Paved Shoulders 50.79 Station Pavement Markings 832.20 Square Yard Pavement Scarification 92.70 Square Yard Pavement, p.c.c. 759.40 Square Yard Removal Of Pvmnt/Drives/Sdwk 2.70 Station Shoulder Construction 52.40 Ton Special Backfill 1,450.00 Linear Foot Temp. Barrier Rail 1.00 Each Temp. Traffic Signals

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents