Similar Projects
Attoyac Bayou Site 21 Remedial Repairs In Nacogdoches County, Texas
Term Contract
Design
$100,000 to $250,000 est. value

Sharp Warehouse III
New Construction, Infrastructure - 22,000 SF
Design
$1,500,000 CJ est. value
Rockwall, TX 75032

Rochell Elementary School Replacement
Demolition, New Construction, Infrastructure - 79,000 SF
Bidding
$38,000,000 CJ est. value
Rockwall, TX 75032

Royse City Independent School District (RCISD) Elementary School #7
New Construction, Infrastructure - 103,000 SF
Post-Bid
$10,000,000 CJ est. value
Royse City, TX 75189

Construction of Earthwork Improvements to Serve Magnolia, Phase 10
Infrastructure
Post-Bid
$800,000 CJ est. value
Royse City, TX 75189

Rockwall High School Main Entry Retaining Wall
Alteration
Results
$641,000 est. value
Rockwall, TX 75087

Rockwall Technology Park Phase V Infrastructure
Infrastructure
Results
$20,000,000 to $25,000,000 est. value
Rockwall, TX 75032

Lefere Shell Office Building
New Construction, Infrastructure - 7,766 SF
Construction
$1,176,450 CJ est. value
Rockwall, TX 75087

Rockwall ISD - New 9th Grade Centers
New Construction, Infrastructure - 386,000 SF
Construction
$105,000,000 CJ est. value
Rockwall, TX 75087

Platform Rockwall
New Construction, Infrastructure - 77,234 SF
Pending Verification
$17,000,000 CJ est. value
Rockwall, TX 75087

New Elementary School #8 - 2021 Bond - Royse City Independent School District
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Royse City, TX 75189

The Horizon at Fate Main / Rockwall
New Construction, Infrastructure - 51,587 SF
Design
$4,850,000 CJ est. value
Rockwall, TX 75087

Rabbit Ridge Phase 2 Paving, Drainage, and Water Improvements
Infrastructure
Post-Bid
Heath, TX

Sabine Creek Wastewater System Sabine Creek Wastewater Treatment Plant - Expansion to 7 MGD
Addition, Demolition, Infrastructure
Results
$69,831,000 CJ est. value
Royse City, TX 75189

Medical Office Building/ Rockwall
New Construction, Infrastructure - 5,835 SF
Pending Verification
$4,000,000 CJ est. value
Rockwall, TX 75087

Last Updated 02/10/2023 06:35 PM
Project Title

Melody Ranch Channel Improvements

Physical Address View project details and contacts
City, State (County) Fate, TX 75189   (Rockwall County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $322,640 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the regrading approximately 1,500 linear feet of an existing earthen channel located from Margaret Street to approximately James Street within the Melody Ranch subdivision in Fate, Texas. The improvements will consist of reestablishing the channel flowline, removing trees within the channel and installing a concrete pilot channel in the channel. In case of ambiguity or lack of clearness in stating proposal prices, the Owner reserves the right to adopt the most advantageous construction thereof, or to reject any or all bids. No bid may be withdrawn within forty-five (45) days after date on which bids are opened. A CASHIER'S CHECK, certified check or acceptable bidder's bond made payable to the City of Fate, Texas, in an amount of 5% of the bid submitted must accompany each bid as a guarantee that if awarded the contract, the bidder will promptly enter into a contract and execute such bonds as are required. A performance bond, a payment bond, and a maintenance bond, each in the amount of not less than one hundred (100%) percent of the contract price, conditioned upon the faithful performance of the contract and upon payment of all persons supplying labor or furnishing materials, will be requested. The undersigned bidder agrees to execute and file with the Owner a contract and bonds on the forms provided within ten (10) days after written notification of award of the contract to the Contractor and to begin the work to be performed under the contract to be substantially complete in 90 calendar days and complete in full within 120 calendar days.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents