Similar Projects
CR97 and CR297A Intersection Improvements
Infrastructure
Bidding
$800,000 est. value
Pensacola, FL

Southwest Greenway Repairs Project - Glynn Key Pond
Infrastructure
Bidding
$600,000 est. value
Cantonment, FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Bayou Boulevard, Lee, Lloyd and Stanley Street Outfalls to Bayou Texar Stormwater Treatment Enhancement
Results
Pensacola, FL

Klondike Road at Cedarbrook Estates Pond
Results
Pensacola, FL 32526

Construction of Upland Road Drainage Improvements
Infrastructure, Alteration
Bidding
$200,000 est. value
Cantonment, FL 32533

12th Avenue at Fairfield Drive Drainage Improvements
Infrastructure
Post-Bid
West Pensacola, FL 32505

Fairchild Street Swale Upgrade Project
Results
Less than $122,000 est. value
Pensacola, FL 32504

SR 298 - Milling and Resurfacing, Shoulder Widening, Turn Lane Widening, Drainage, Signing and Pavement Markings and Signalization
Infrastructure
Post-Bid
$5,410,835 est. value
Pensacola, FL 32506

Pensacola Bay Living Shoreline Greenshores II
Results
Pensacola, FL 32502

River Road Culvert Repairs Construction Project
Infrastructure
Post-Bid
$200,000 est. value
Pensacola, FL 32598

Burgess Road Sidewalk & Drainage Improvements
Results
Less than $1,570,000 est. value
Pensacola, FL 32598

Washington High School Pond Rehabilitation
Results
Pensacola, FL 32504

Floridian Ditch Restoration Phase II (Sarasota Project)
Infrastructure
Results
Bellview, FL

Reported 06/16/2022 12:00 AM
Project Title

Blue Springs Drainage Improvements at Crescent Lake (Construction)

Physical Address View project details and contacts
City, State (County) Pensacola, FL   (Escambia County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project will restore the damaged areas and provide flooding relief to the neighborhood. The project includes sediment and debris removal, 600 LF of new storm sewer, new stabilized subgrade, graded aggregate base and approximately 3,750 SY of milling and resurfacing. All these components will re-establish pre-storm conditions within this neighborhood located within District 1.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents