Similar Projects
1911 Spring Pump House Upgrade
New Construction
Bidding
Valley Head, AL

Crenshaw Street Lift Station and Force Main Upgrades
New Construction, Infrastructure
Bidding
Mobile, AL 36606

New Industrial Area Booster Pump Station
Post-Bid
Decatur, AL 35609

New Pumping Station (Contract C)
Post-Bid
Irvington, AL 36544

South Parkway Raw Water Pump Station Improvements
Results
Less than $2,294,106 est. value
Huntsville, AL 35804

Stonehill Booster Pump Station
Results
Talladega, AL 35160

Fort Morgan Road Sewer Improvements - Marina Lift Station and Peninsula Lift Station
Renovation
Construction
Gulf Shores, AL 36547

Rehabilitation of Pumping Station No. 2
Post-Bid
Less than $110,000 est. value
Samson, AL

VA Water Tank Improvements, Contract A: Water Booster Station Improvements
Results
Less than $436,956 est. value
Tuscaloosa, AL

2020 Sanitary Sewer Lift Station Improvements
Post-Bid
Less than $300,000 est. value
Hayneville, AL 36040

Jones Road Pump Station Upgrade and Gravity Sewer
Results
Athens, AL 35613

2020 Miscellaneous Pump Station Improvements (Pump Station 25, 31, and 37) Project
Post-Bid
Less than $2,500,000 est. value
Montgomery, AL 36109

Cherry Tree Booster Pump Station
Results
Less than $370,751 est. value
Huntsville, AL 35801

USDA Crown Castle 500,000 Gal EWT and CR 266 300,000 Gal EWT and USDA Water System Improvements
Post-Bid
Less than $2,200,000 est. value
Valley, AL 36854

Gin Shop Lift Station Improvements
Results
Prattville, AL

Reported 09/24/2021 12:00 AM
Project Title

Lift Station 1 Improvements Phase 2

Physical Address View project details and contacts
City, State (County) Guntersville, AL   (Marshall County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Modifications to GWSB Lift Station No.1 including replacement of two (2) existing pumps with 65hp pumps, some pipe and fitting replacements, modifications to existing hatch openings, valve replacement and electrical modifications to Station #1.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents