Last Updated 08/14/2020 09:27 AM
Project Title

Irrigation Pump Station

Physical Address View project details and contacts
City, State (County) Laredo, TX 78041   (Webb County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor will be required to remove and relocate the two existing Irrigation Pump Stations to a pre-determined location by SSC; onsite. The first pump station is located in the back (east) of the Lamar Bruni Vergara Science Center. The second pump station is located to the west of the Western Hemispheric Trade Center. Then the addition of the new irrigation pump stations will need to be recommended based off of appropriate engineering documentation. The pump stations will be shipped onsite by the contractor and unloaded if the weight exceeds 14,000 lbs. The contractor will be responsible for the installation, setup and calibration, and the operation training for applicable SSC employees for the two new pump stations. Alternates for the removal and relocation of the existing fiberglass storage tanks, installation of new storage tanks, and the addition and installation of pump station enclosures are also requested for the project. Refer to the items below for more specific information on the requirements for the project; both of the irrigation pump stations will need to meet these requirements.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.