Similar Projects
First Coast Connector (FCC) - SR 23 to Maryland Avenue Design-Build
Infrastructure
Bidding
Green Cove Springs, FL 32043

Concrete Box Culvert/Drainage Improvements/Milling and Resurfacing/Base Work - CR 259
Infrastructure
Bidding
$3,273,471 est. value
FL

Construction Services for Project Improvements Phase 3D also known as Riverstone Phases 5 and 6
Post-Bid
FL

Villages B, C, and D1, Curley Road (CR 577) Segment B Roadway Improvements
Post-Bid
Wesley Chapel, FL 33545

Atlantic High School - Replace Track
Results
Less than $475,000 est. value
Port Orange, FL 32129

Mirabay Pavement Rehabilitation Project
Results
Apollo Beach, FL 33572

Downtown Revitalization Project Phase II
Infrastructure
Bidding
$6,000,000 est. value
Saint Cloud, FL

Construction Management at Risk Services
Post-Bid
Hollywood, FL 33022

Design Build Push Button Contract No. 2 - Program Management
Results

Asphalt Repair
Infrastructure
Bidding
$1,430,000 est. value
FL

CDBG Street Resurfacing
Post-Bid
Plant City, FL

Citation Parkway Improvements
Results
Less than $2,260,000 est. value
Palm Coast, FL 32164

Florida Mango Road Utility Relocation project between Edgewater Drive and Barbados Road
Infrastructure
Bidding
Glen Ridge, Palm Springs, West Palm Beach, FL 33406

Imagine Clearwater Park (Buildings, Hardscape, Landscape and Other Site Improvements)
New Construction
Post-Bid
$65,000,000 est. value
Clearwater, FL 34621

Asphalt Paving Projects for FY 2020
Results
$965,000 est. value
Ocoee, FL 34761

Last Updated 12/06/2021 08:11 AM
Project Title

6th Avenue Milling and Resurfacing from U.S. 1/S.R. 5 to 21st Street

Physical Address View project details and contacts
City, State (County) Vero Beach, FL 32969   (Indian River County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,800,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consist of milling and resurfacing the existing asphalt pavement, replacing deficient sidewalk panels, filling in sidewalk gaps and upgrading pedestrian crossings to current FDOT standards

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents