Similar Projects
PSC and Office Building Facade and Glass Renovation
Alteration
Bidding
Raleigh, NC 27601

Dobbs Building West Elevation Sealant Replacement
Alteration
Bidding
Raleigh, NC 27603

South Campus Building 2000 Exterior Sealant Restoration
Post-Bid
Concord, NC 28027

WWTP Install Railings, Stair, and Walkway
Post-Bid
$25,000 to $100,000 est. value
Cherry Point, NC

Remove and Install Shake Siding
Results
Less than $19,995 est. value
Greenville, NC

Lee County Government Center Exterior Wall Restoration Project
Results
Sanford, NC 27330

Y--RTP Campus Entrance Construction
Construction
$1,000,000 to $5,000,000 est. value
Durham, NC 27711

Insulation Installation and Repair Service
Term Contract
Bidding
NC

Metal Composite Wall Panels
Post-Bid
Raleigh, NC

Replace Launder Walls Clarifier Number 4 Bldg 4376
Results
$25,000 to $100,000 est. value
Cherry Point, NC 28533

B1009 Remove and Repair Stucco
Term Contract
Bidding
$25,000 to $100,000 est. value
Cherry Point, NC 28533

Vinyl Siding
Post-Bid
Robersonville, NC 27871

Installation of Helical Piers - Turner Terrace
Results
Less than $11,400 est. value
Lumberton, NC 28358

Comprehensive Purchasing Consortium for CCHRCO
Post-Bid

Orange County Sheriff`S Office Water Proofing
Results
Hillsborough, NC 27278

Last Updated 03/29/2022 10:23 AM
Project Title

The Coast-Canopy

Physical Address View project details and contacts
City, State (County) Bolivia, NC 28422   (Brunswick County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The general scope involves furnishing and installing of Aluminum Canopy Systems. Work to include but not limited to suppling of Engineered Drawings, include any cost for geotechnical soil borings or data if needed or required, include permit cost, include all material and labor for the layout of footings, dig, prep and place footings for canopy systems, and installation of canopy systems, and all incidental work relating to the project to provide the complete and fully functional operating canopy systems. Contractor is responsible for scope and to verify all dimensions and sizes.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents