Similar Projects
Pigeon Creek Pump Station Outfall and West Alley Repairs Project - REBID
Infrastructure
Bidding
$90,000 CJ est. value
Monongahela, PA 15063

Pocopson Elementary School Pump Station Project
Infrastructure
Bidding
$152,000 CJ est. value
West Chester, PA 19382

Pump Station 2 Grinder Project
Post-Bid
Gilbertsville, PA

George R. Sweeney Water Treatment Plant Raw Water Pump Station Upgrades - General/Mechanical
Addition
Post-Bid
Greensburg, PA

Furnishing 35 Grinder Pumps and 2 Spare Grinder Pump Cores
Results
Johnstown, PA 15904

East Headworks - General Construction
Results
$78,474,915 est. value
Pittsburgh, PA

Maple Grove Sewage Pumping Station and Interceptor Expansion - General Construction
Construction
$1,400,000 est. value
Lancaster, PA 17603

East Halls Pump Station Upgrades
New Construction, Demolition
Construction
$1,980,000 est. value
University Park, PA

Cleaning Out and Plugging Ten Orphan Wells
Infrastructure
Bidding
$5,000,000 CJ est. value
Sewickley, PA 15143

Bridgeport Pump Station Pump 2 Replacement
Addition
Post-Bid
Mount Pleasant, PA

Pump Station Monitoring Installation
Results
McClellandtown, PA

Miller Road Sewage Pumping Station Expansion - Contract No. 4 - Force Main
Addition, Demolition, Renovation, Infrastructure
Construction
$2,071,083 CJ est. value
Elizabethtown, PA 17022

Murrysville Heights Pump Station Elimination
Infrastructure
Bidding
$75,000 CJ est. value
Murrysville, PA 15668

Oliver Road Pump Station Project
New Construction, Infrastructure
Post-Bid
$1,200,000 est. value
Erie, PA

Pump Station 11 Upgrades Project
Results
Wilkes-Barre, PA 18702

Last Updated 10/20/2022 06:09 AM
Project Title

Lincoln Pump Station: Bypass Pump Station - General

Physical Address View project details and contacts
City, State (County) Pittsburgh, PA 15219   (Allegheny County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $1,837,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Description: PWSA is requesting bids for Lincoln Pump Station: Bypass Pump Station - General Contract. Work of the General Contract includes the furnishing, installation, disinfection, testing, and startup of a temporary prefabricated water booster pump station of the Pittsburgh Water and Sewer Authority (PWSA) Lincoln Pump Station location. The General Contract will be required to furnish and install in place the temporary pump station enclosure, suction and discharge piping from the package station to the existing above ground connections, as well as the controls enclosure including all required electrical and controls equipment needed to furnish the pump station system as a standalone system fully tested and operational prior to delivery on site. Site work preparation including the removal of existing bollards, site leveling, install and compaction of crushed aggregates, and the furnishing and installation of fencing around the temporary pump station site where shown on drawings. Questions Due Date: Jun 9th 2022, 4:00 PM EDT

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents