Similar Projects
Traffic Signalization Improvements - 14592 - City of Carlsbad
Infrastructure
Conception
$1,050,000 CJ est. value
Carlsbad, NM 88220

Traffic Signalization Improvements - 14592 - City of Carlsbad
Infrastructure
Conception
$1,050,000 CJ est. value
Carlsbad, NM 88220

Subway - Artesia
New Construction, Infrastructure - 2,344 SF
Bidding
$1,500,000 CJ est. value
Artesia, NM 88210

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

South Freeman Street Waterline
Infrastructure
Results
$582,205 est. value
Artesia, NM 88210

Y--NM-Valle De Oro NWR-Water Control Wetland 1 & 2 On
Term Contract
Results
Albuquerque, NM 87105

Dark Canyon Bridge Project - City of Carlsbad
New Construction, Infrastructure
Pending Verification
$10,100,000 CJ est. value
Carlsbad, NM 88220

Water and Wastewater Phase II Water Infrastructure Project
Infrastructure
Post-Bid
Artesia, NM

Eddy County West Loop Road - Lea Street Thru Hackberry Draw Project
Infrastructure
Results
$1,820,590 est. value
Carlsbad, NM

20th Street Reconstruction - Hermosa Drive to Main Street
Infrastructure
Post-Bid
Artesia, NM 88210

Roadway Reconstruction, Lighting, Signalization
Infrastructure
Results
NM

Roads, Waste Water and Storm Drainage and Infrastructure Construction
Term Contract
Post-Bid
Carlsbad, NM

Poplar Street - Roadway, Water and Sewer Improvements
Infrastructure
Results
$1,433,822 est. value
Loving, NM 88256

Exterior Resurfacing of the Riverwalk Recreation Center
Infrastructure
Post-Bid
$585,536 CJ est. value
Carlsbad, NM 88220

Last Updated 01/20/2023 10:53 AM
Project Title

Kircher Street Construction - City of Carlsbad

Physical Address View project details and contacts
City, State (County) Carlsbad, NM 88220   (Eddy County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected January 2020
Bids Due View project details and contacts
Estimated Value $850,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for curb and gutter work and making the street complaint with the Americans with Disabilities Act is part of the project. The project includes engineering and construction of Kircher from Boyd Drive to National Parks Highway. As of August 16, 2019 this project is conceptual. Bidding for design team or contractor selection has not been released. A firm timeline has not been established.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents