Similar Projects
Road Work - Conrad Street Paving and Appaloosa Project TST
Infrastructure
Bidding
Charleston, SC

Agerton Neighborhood Revitalization Phase 1
Infrastructure
Bidding
Cheraw, SC

Asphalt Re-Striping and Resealing - CF Reames, McCants and Centerville
Term Contract
Post-Bid
Anderson, SC 29621

Grier Street Road Improvements
Post-Bid
Sumter, SC 29150

Pennies for Progress Road S-424 (Bate Harvey Road) Road Rehabilitation Project
Results
York, SC 29745

Computer Center Road Improvements Phase II
Results
$197,937 est. value
Clemson, SC 29631

Patching, Leveling, Resurfacing and Line Striping of Selected Roads
Infrastructure
Bidding
$500,000 to $1,000,000 est. value
Greenwood, SC

Road Resurfacing and Maintenance
Post-Bid
Easley, SC

Paving At Mcbee High School
Results
Less than $223,754 est. value
McBee, SC 29101

Intersection Improvements - US 278/US 321
Infrastructure
Bidding
SC

Rehabilitation- S-46 S-50 S-892
Post-Bid
SC

Mccormick County Industrial/Technology Park Road and Sign Improvements
Results
McCormick, SC 29835

Interchange Improvements - I-85
Infrastructure
Bidding
SC

Reconstruction/Rehabilitation - District 5
Post-Bid

Painswick and Stanwick Road Paving TST
Results
Johns Island, SC 29455

Last Updated 09/15/2021 08:17 AM
Project Title

Rehabilitation - Lee Co

Physical Address View project details and contacts
City, State (County) SC   (Lee County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Traffic Control 1.000 Ls Removal & Disposal Of Existing Pavement 3,105.000 Sy Removal & Disposal Of Existing Curb 2,150.000 Lf Unclassified Excavation 133.000 Cy Borrow Excavation 2,900.000 Cy Excavation For Shoulder Paving 1,391.500 Sta Hauling Of Excavated Shoulder Material 1,391.500 Sta Maintenance Stone 108.250 Ton Hma Shoulder Widening Course 7,402.560 Ton Liquid Asphalt Binder Pg64-22 2,183.843 Ton Full Depth Asph. Pav. Patching 6" Unif. 6,500.000 Sy Full Depth Asph. Pav. Patching 8" Unif 1,500.000 Sy Full Depth Asph. Pav. Patching 10"Unif 2,825.000 Sy Milling Existing Asphalt Pavement 2.0" 89,200.000 Sy Milling Existing Asphalt Pavement (Variable) 3,350.000 Sy Milled-In Rumble Strip 19.760 Mi Hot Mix Asphalt Intermediate Course Type b 2,825.387 Ton Hot Mix Asphalt Surface Course Type b 7,072.480 Ton Hot Mix Asphalt Surface Course Type c 17,701.683 Ton Hot Mix Asphalt Surface Course Type d 1,166.367 Ton Driveway Paving-Surface Type c 1,287.875 Ton Permanent Construction Signs (Ground Mounted) 2,180.000 Sf 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 3,910.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 327,600.000 Lf 8"White Solid Lines(Crosswalk&Channelization)Fast Dry Paint 7,100.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 3,540.000 Lf White Single Arrow (Left, Straight, Right)-Fast Dry Paint 48.000 Ea White Word Message "Only"-Fast Dry Paint 22.000 Ea White Combination Arrow(Str.& Rt.Or Str.& Lt.)Fast Dry Paint 12.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 46,020.000 Lf 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 253,440.000 Lf 6" Yellow Solid Line On Curb/Median - Fast Dry Paint 1,020.000 Lf 4" White Broken Lines(Gaps Excl.)Thermoplastic- 90 Mil. 1,440.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 19,950.000 Lf 8" White Solid Lines Thermoplastic - 125 Mil. 3,340.000 Lf 12in x 18in White Triang. Yield Bar (Gaps Exc)Thermo-125mil 35.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Thermo.-125 Mil 1,250.000 Lf White Single Arrows (Lt, Strght, Rt) Thermo.-125 Mil. 24.000 Ea White Word Message "Only" -Thermoplastic - 125 Mil. 11.000 Ea White Combination Arrows(Str&Rt.Or Str&Lt)Thermo-125mil 6.000 Ea 4" Yellow Broken Lines(Gaps Exc)Thermoplastic - 90 Mil. 7,810.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Thermo-90 Mil. 25,970.000 Lf Permanent Clear Pavement Markers- Mono-Dir.- 4"x4" 110.000 Ea Permanent Yellow Pavement Markers Mono-Dir.- 4"x 4" Perm. Yel. 570.000 Ea Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 1,595.000 Ea 4" White Broken Lines- (Gaps Excld) - Single Component Hybridized Polymer– 20 Mils 730.000 Lf 4" White Solid Lines-(Pavement Edge Lines)-Single Component Hybridized Polymer–20 Mils 125,950.000 Lf 8" White Solid Lines-(Cross Walk & Channelization)-Single Component Hybridized Polymer–20 Mils 210.000 Lf 12in x 18in White Triang. Yield Bar (Gaps Exc)Sc Hybridized Polymer- 20mil 001 18.000 Lf 24" White Solid Lines-(Stop/Diagonal Lines)-Single Component Hybridized Polymer–20 Mils 480.000 Lf 4" Yellow Broken Lines (Gaps Excluded) - Single Component Hybridized Polymer - 20 Mils 12,950.000 Lf 4" Yellow Solid Lines (Pavement Edge & No Passing Zone) - Single Component Hybridized Polymer - 20 Mils 99,500.000 Lf Furnish & Install 1.0" Schedule 80 Pvc Conduit 255.000 Lf Furnish & Install 2.0" Schedule 80 Pvc Conduit 1,845.000 Lf Furnish & Install 2" Schedule 80 Hdpe Conduit (Directional Bored) 75.000 Lf Furnish & Install No. 14 Copper Wire, 4 Conductor - Gray 1,920.000 Lf Furnish & Install No. 14 Copper Wire, 8 Conductor (Gray) 75.000 Lf Furnish & Instl No. 14 Copper Wire,1-Conductor For Loop Wire 5,880.000 Lf Sawcut For Loop Detector 1,905.000 Lf f&i-12"x12"x12"d.Elec.Flush Undgrd.Enclos-(Str.Poly.Conc.)Hd 15.000 Ea f&i-13"x24"x18"d.Elec.Flush Undgrd.Enclos-(Str.Poly.Conc.)Hd 3.000 Ea Adjust Drop Inlet Adjust d. i. 2.000 Ea Catch Basin t-17 (Convert c.b. Type 5) 2.000 Ea Concrete Curb And Gutter(1'-6") Vertical Face 1,500.000 Lf Concrete Curb And Gutter(2'-0") Vertical Face 650.000 Lf Concrete Sidewalk(4" Uniform) 1,100.000 Sy Detectable Warning Material 600.000 Sf Concrete Driveway(6" Uniform) 240.000 Sy Concrete Median 185.000 Sy Pedestrian Ramp Construction 1,200.000 Sy Mt3 Leading End Treatment Tl3 4.000 Ea Mgs3cs Gr Compressed Shoulder 200.000 Lf Permanent Grassing For Non-Permitted Resurfacing Projects 13.418 Acre

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents