Similar Projects
Waterline Replacement
Bidding
$25,000 to $100,000 est. value
WV

Water System Improvements Project
Bidding
Pennsboro, WV

Water System Improvements
Post-Bid
Less than $1,921,000 est. value
Augusta, WV 26704

Right Fork Water Line Extension Project
Post-Bid
Danville, WV

Cardinal Pointe Water Main
Results
$2,000,000 est. value
Martinsburg, WV 25401

Water Line Relocation – Elk Fork Road (CR 11)
Results
Less than $43,860 est. value
Friendly, WV 26146

Blennerhassett Condensing Water Piping Replacement
Bidding
Parkersburg, WV

Station 1 Water Softener
Post-Bid
Martinsburg, WV

Arlington/Glen Falls Water Line Improvement Project
Results
Clarksburg, WV 26301

Water Meter Improvements - Central Boaz Public Service District
Bidding
Vienna, WV

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Chief Logan State Park Sewage System Upgrades
Renovation
Bidding
Logan, WV 25601

East Martin Street Utility Relocation
Results
$542,955 est. value
Martinsburg, WV 25401

Proposed Water Line Replacements
Results
McMechen, WV 26040

Contract #1 - Overall Water System Extension
Results
Clarksburg, WV 26422

Last Updated 05/05/2021 03:39 PM
Project Title

Main Street, Charles Street, and Commerce Street Waterline Replacement

Physical Address View project details and contacts
City, State (County) Wellsburg, WV 26070   (Brooke County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,745,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed project consists of the removal and replacement of approximately 10,300 linear feet (LF) of water line, approximately 4,150 linear feet (LF) open cut service reconnections,approximately 2,150 linear feet (LF) bore and jack service reconnections, valves, fire hydrants, service tubing. This project also consists of approximately 3,800 LF of sidewalk repair and 6,800 LF of milling and 2” HMA Overlay.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents