Similar Projects
Construction of Sanitary Sewer, Water Line, Drainage Facilities, and Paving for Veranda Townhomes, Phase 2
Bidding
League City, TX

Island Transit Trolley Barn Concrete Flood Wall
Bidding
$205,000 est. value
Galveston, TX

14th Street Ditch Improvements
Post-Bid
Texas City, TX 77590

Sabine Pass to Galveston Bay Port Arthur & Vicinity Contract 2
Post-Bid
$20,000,000 est. value
Galveston, TX

Water, Sanitary, and Drainage Facilities in Lago Mar Pod 5 Section 1
Results
Less than $1,096,990 est. value
TX

Landing Ditch Improvements at FM 518
Results
Less than $550,000 est. value
League City, TX

Island Transit Trolley Barn Deployable Flood Wall
Bidding
$400,000 est. value
Galveston, TX

Canal System Restoration, Project Site Group I
Post-Bid
Texas City, TX 77591

Bacliff Villas Drainage Restoration
Results
Less than $800,000 est. value
Galveston, TX 77550

Dickinson Bay Bird Island 2 Project
Bidding
$4,900,000 to $6,600,000 est. value
Galveston, TX

Steel Riveted Corrugated Metal Pipe
Post-Bid
Texas City, TX

Legas Drive Bulkhead
Results
$236,169 est. value
Galveston, TX 77550

Willow Bayou/Avenue L Drainage
Post-Bid
$1,700,000 est. value
Galveston, TX 77551

9th and 11th Avenue Drainage Restoration
Results
Less than $400,000 est. value
Galveston, TX 77550

Galveston Seawall Rip Rap Deficiencies West of 61st Street
Post-Bid
$2,200,000 est. value
Galveston, TX

Last Updated 05/14/2021 09:07 AM
Project Title

Construction of Lago Mar Pod 3 Detention, Pod 4 Detention & Channel Revision

Physical Address View project details and contacts
City, State (County) TX   (Galveston County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes the excavation and grading of a detention basin and earthen pilot channel, the revision to the TOE of an existing detention basin, and the revision to the TOB of an existing drainage channel. The project also includes the installation of rip rap, storm sewer outfalls, concrete slope paving, and drainage structures.

Details

Division 31 - Earthwork, Grading, Excavation and Fill, Excavation, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents