Similar Projects
PA 531: Depot Road, Section 4
Infrastructure
Conception
$1,275,000 CJ est. value
Harborcreek, PA 16421

PA 531: Depot Road, Section 4
Infrastructure
Conception
$1,275,000 CJ est. value
Harborcreek, PA 16421

Poplar Street Townhomes
New Construction, Infrastructure - 15,436 SF
Design
$6,000,000 CJ est. value
North East, PA 16428

Erie 2022 Bridge Shotcrete Group
Infrastructure, Renovation
Design
$380,000 CJ est. value
Erie, PA 16504

Harbor Road, Aaron Road, and South Shore Drive Water Main Replacement
Infrastructure
Bidding
$300,000 CJ est. value
Erie, PA 16501

PA 699 Edinboro Road Bridge over Walnut Creek Branch
Demolition, New Construction, Infrastructure
Bidding
$500,000 CJ est. value
Asbury, PA 16506

Major Bridge P3
New Construction
Post-Bid

Site Improvements at Erie County 911 Building
Infrastructure
Post-Bid
Erie, PA 16509

Bartlett Road Bridge No. 1 Replacement Project
Results
Harborcreek, PA

Superpave Leveling Course
Results
Girard, PA

SR 19: I-90 to Rotunda Dr
Infrastructure
Conception
$2,830,000 CJ est. value
Summit Township, PA 16441

Erie's Bayfront Parkway Multimodal
Infrastructure
Design
$14,793,360 CJ est. value
Erie, PA 16502

Holly Acres Estates - Well 2 Connection
Infrastructure
Bidding
$400,000 CJ est. value
Erie, PA 16509

Asbestos Abatement, Structure Demolition, and Site Restoration
Demolition, Infrastructure, Alteration
Post-Bid
Fairview, PA 16415

Wilson Road 2021 Improvement Project
Infrastructure
Results
North East, PA

Last Updated 01/06/2023 01:33 AM
Project Title

SR 8009 Ramp C over I-79

Physical Address View project details and contacts
City, State (County) Erie, PA 16501   (Erie County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected March 2032
Bids Due View project details and contacts
Estimated Value $75,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

State Route 8009, Ramp C over Interstate 79 City of Erie, Erie County Bridge Replacement/Rehabilitation/Preservation As of January 06, 2023, the project is in development stage. Anticipated letting date is January 01 2035. NTP Date: 2035-03-02. PennDOT SR 8009 Ramp C over I-79 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents