Similar Projects
Last Updated | 10/06/2023 04:04 AM |
Project Title | Bid Factor Mowing, Litter Removal and Edging |
Physical Address | View project details and contacts |
City, State (County) | Miami, FL 33132 (Miami-Dade County) |
Category(s) | Single Trades |
Sub-Category(s) | Service/Term Contracts |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected November 2023 |
Bids Due | View project details and contacts |
Estimated Value | $106,084 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Counties: Miami-Dade Road Name: Litter Removal and Mowing Miami-dade County Limits: Midpoint Project(s): 44881127201(*) Federal Aid No: N/A Total Roadway Length: 0.000 Miles Contract Days: 365 Total Bridge Length: 0.000 Miles Total Proposal Length: 0.000 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: Description: Bid Factor Bidding This Contract consist of Traffic Operations Push-Button Signals Miscellaneous Construction at various locations. Pre-qualification is required. This is a Business Development Initiative (BDI) and Bid Factor contract to perform mowing, litter removal and edging on various sections of State Road 25 (Okeechobee Road). The limits and estimated quantities per cycle, per section of the roadway are specified in Attachment "A" on page 38 of the Specifications Package. Prequalification per Rule 14-22 is not required. It is only necessary to submit the Small Business Affidavit (SBA) form once per year. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. Question Deadline 11/09/2023 Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. FDOT - Call Order: 002 Drainage Improvements - Miami-Dade |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |