Similar Projects
Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

Memorial Park Athletic Field Renovation Project
Infrastructure
Bidding
$800,000 CJ est. value
San Anselmo, CA 94960

Memorial Park Athletic Field Renovation Project
Infrastructure
Bidding
$800,000 CJ est. value
San Anselmo, CA 94960

Fire Flow Improvement Program Ridge Road Pipeline Replacement Project
Infrastructure
Post-Bid
$1,760,000 est. value
Tiburon, CA

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

East Blithedale Rehabilitation Project - Phase I
Alteration
Results
$3,000,000 est. value
Mill Valley, CA

Downtown Rehabilitation Project - Phase II
Alteration
Results
$600,000 to $800,000 est. value
Mill Valley, CA

2022 Pavement Rehabilitation Project
Infrastructure
Bidding
$318,000 est. value
Ross, CA

CA NPS 2021(1), Pavement Preservation Bay Area
Term Contract
Post-Bid
$2,000,000 to $3,000,000 est. value
Danville, Martinez, Mill Valley, San Francisco, CA 94526

2021 Northern Region Road Rehabilitation: Phase 2
Infrastructure
Results
$650,000 est. value
CA

2022 Pavement Improvement Project
Infrastructure
Bidding
$580,000 to $590,000 est. value
Sausalito, CA 94965

Positive Location of Underground Utility Facility (Potholing) Services
Infrastructure
Post-Bid
$1,400,000 est. value

2021 Redwood Highway Frontage Road Pavement Repair Phase 1
Infrastructure
Results
$350,000 est. value
Mill Valley, CA 94941

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

Last Updated 07/22/2022 05:03 AM
Project Title

Maintain Unimproved Road Shoulders and Grade, Golden Gate National Recreation Area

Physical Address View project details and contacts
City, State (County) Mill Valley, CA 94941   (Marin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This construction project is for: Maintaining Unimproved Road Shoulders and Grade Golden Gate National Recreation Area. a. This project is a 100% Total Small Business Set-Aside. NAICS: 237310, Highway, Street, and Bridge Construction, the small business size standard is $39.5 million. b. Award of this solicitation will result in a single award firm-fixed price contract. c. Onsite construction shall be executed within 10 calendar days of notice to proceed. d. IAW FAR 36.204(c), the magnitude of construction is between $100,000 and $250,000. e. See Section L and M for quote instructions. Questions shall be electronically sent to Mr. Alexander Salgado at alex_salgado@nps.gov. Questions are due 4 days from the closing date at 2:00PM Pacific Time. f. Quotes shall only be accepted through electronic mail addressed to alex_salgado@nps.gov. All quote documents required by this solicitation must be uploaded and received in their entirety no later than the closing due date/time of July 15th, 2022 @ 2:00PM Pacific Time. Quotes submitted by hardcopy or SAM.gov shall not accepted or considered. The contractor shall provide all supervision, labor, and equipment necessary to complete the work as identified in the project. Government furnished material is included as part of this requirement. Legacy Doc #: NPS Delivery: 60 Days After Notice to Proceed Delivery Location Code: 0009060573 NPS, GOLDEN GATE NRA Bldg. 201, Fort Mason San Francisco CA 94123-1307 US 00010 Mobilization/Demobilization Product/Service Code: Z1LB Product/Service Description: MAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS Period of Performance: 07/30/2022 to 10/15/2022 The work of this contract is for the construction of the following project: Maintaining Unimproved Road Shoulders and Grade - Golden Gate National Recreation Area Project Location: Mill Valley, California and Sausalito, California - Marin County Project Description: The purpose of this project is to grade the roads and add material where needed to promote positive drainage. This will improve accessibility for visitors and employees and emergency services through out the park. It will also address deferred maintenance. This contract will consist of grading approximately 3.5 miles of road, Marincello, Haypress, and Fox trail in Mill Valley, and approximately 2,000 LF of shoulder repair along Bunker Road in Sausalito. The specific work items include but is not limited to road grading, establishing ditch line, watering and compacting, trucking of government furnished property, and shoulder repair. Commencement, Prosecution, and Completion of Work. (APR 1984) The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 60 days. The time stated for completion shall include final cleanup of the premises. Deliverable (Post-Award): Contractor's Daily Logs Contractor shall prepare a daily log for each day work is performed under this contract. Copies of daily logs shall be submitted to the Contracting Officer, and may be compiled and submitted weekly, with payroll. Time necessary for completion of daily log is approximately 15 to 30 minutes. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents