Similar Projects
New Multi-Purpose Indoor Space
New Construction
Conception
Ponca City, OK 74601

New Baseball Complex
New Construction
Conception
Ponca City, OK 74601

Moore High School Indoor Practice Facility - 2021 Bond - Moore Public Schools
New Construction
Design
$4,500,000 CJ est. value
Moore, OK 73160

Southmoore High School Indoor Practice Facility - 2021 Bond - Moore Public Schools
New Construction
Design
$4,500,000 CJ est. value
Moore, OK 73160

Edmond North High School West Shelter Addition
Addition, Infrastructure - 5,300 SF
Sub-Bidding
$2,000,000 CJ est. value
Edmond, OK 73003

Piedmont Middle School
New Construction
Post-Bid
$16,000,000 est. value
Piedmont, OK 73078

McAlester Middle School and Event Center
New Construction - 100,000 SF
Post-Bid
$25,000,000 est. value
McAlester, OK 74501

Challenger Sports Complex Restroom
Renovation
Results
Broken Arrow, OK 74014

Gymnasium at Wilson Elementary School
New Construction
Results
$3,500,000 est. value
Oklahoma City, OK 73103

Indoor 18
New Construction
Construction
Oklahoma City, OK 73114

Owasso Family YMCA
Renovation - 1,230 SF
Construction
Owasso, OK 74055

South Elementary School
New Construction, Addition
Pending Verification
Tulsa, OK 74107

Construction Bond - Jay Public Schools
Build-out, Renovation, Infrastructure
Pending Verification
$12,570,000 CJ est. value
Jay, OK 74346

Indoor Youth Sports Complex
New Construction
Conception
$11,000,000 est. value
Lawton, OK 73507

Westmoore High School Indoor Practice Facility - 2021 Bond - Moore Public Schools
New Construction
Design
$4,500,000 CJ est. value
Oklahoma City, OK 73170

Last Updated 05/02/2023 08:37 AM
Project Title

Gymnasium Flooring and Building Improvements

Physical Address View project details and contacts
City, State (County) Covington, OK 73730   (Garfield County)
Category(s) Entertainment/Recreation
Sub-Category(s) Athletic Facility
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $587,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Per addendum 1 pre bid meeting scheduled for 3/28/23 at 1:30pm SCOPE OF WORK SUMMARY: The following is a summary of the scope of work required for the New Gymnasium Flooring & Building Improvements project for Covington Douglas Schools. This summary is listed to state the basic requirements for the project and is not all inclusive of all work required. See drawings and specifications for additional items and requirements to complete the project. The existing gymnasium building was damaged by broken water pipes. The broken pipes have since been repaired. The damages done by the water in the building were extensive and caused a need for repairs. Demolition of existing ceramic floor tile and base, gypsum board on walls, wall base, ceramic wall tile, millwork, gymnasium wood basketball floor, etc. has been done by others. The requirements of this project are to reconstruct damaged areas and remove and replace items damaged by the water. HIGH SCHOOL BUILDING 1. Replace gypsum wall board and ceramic wall tile at Girl's Rest Room where indicated on the drawings. 2. Replace toilet partition base shoes in Girl's Rest Room. GYMNASIUM BUILDING 1. Replace toilet partition base shoes. 2. Replace wall clean-out covers. 3. Remove and replace sections of concrete floor slab to remove and replace existing floor drains and sewer piping in Locker Rooms (4). (See drawings) 4. Replace vinyl wall base throughout Gymnasium. 5. Replace ceiling tiles at 3 rooms, north Entry Corridor, Laundry Room, and Boy's Home Locker Room. 6. Provide new millwork in Concessions. 7. Concessions space shall be enlarged (alternate bid item). 8. Replace gypsum board wall panel where damaged, ruined, and cut out/removed by others. 9. Repair/replace light fixtures at wet ceiling areas and fixtures that have been wet and/or damaged.Provide bead blast over entire gymnasium court floor for rough surface preparation for new concrete floor topping. 12. Provide new concrete floor topping system over existing concrete floor slab in gymnasium. 13. Provide new Cold Fluid Applied Waterproofing over new concrete floor topping. 14. Provide new tile flooring where indicated on drawings in gymnasium building. 15. Provide new basketball court wood flooring system and markings system in gymnasium. 16. Provide new trophy case. 17. Install new insulation above entries where indicated. 18. Strictly adhere to manufacturer's recommended installation methods and instructions. 19. Clean all surfaces in existing building. Remove all dust on walls and surfaces caused by previous demolition activities and damages to building. 20. Remove old deteriorated caulking and recaulk all deteriorated caulk/sealant joints. 21. Provide all items shown and/or specified to complete work shown on drawings and in specifications.

Details

Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents