Similar Projects
Sundance to South Dakota I-90/ Eastbound and Westbound Lanes - I904146 - Crook County
Infrastructure
Conception
$8,844,000 CJ est. value
Sundance, WY 82729

Sundance to South Dakota I-90/ Eastbound and Westbound Lanes - I904146 - Crook County
Infrastructure
Conception
$8,844,000 CJ est. value
Sundance, WY 82729

WY NPD Yell 14(1) Lewis River Bridge
Term Contract
Post-Bid
Yellowstone National Park, WY

Z--MATOC - IMR Bridges
New Construction
Post-Bid
$10,000,000 est. value

North Wilson Area Snow Removal Project (7-21-M)
Term Contract, Infrastructure
Results

Grading, Placing Pit Run Subbase and Bituminous Pavement Surfacing, Chip Seal, Fencing and Miscellaneous
Infrastructure
Results
WY

South Dakota to Montana US 212 - N481015 - Crook County
Infrastructure
Conception
$6,314,000 CJ est. value
Sundance, WY 82729

Grading, Bituminous Pavement Surfacing, Bridge Rehabilitation, Temporary Concrete Barrier and Miscellaneous
New Construction, Infrastructure
Results

Crook County County Road 112 Over Donkey Creek Structure No. DWL
Demolition, New Construction, Infrastructure
Conception
$950,000 CJ est. value
Hulett, WY 82720

Chip Sealing and Miscellaneous Work
Infrastructure
Results

Sundance Marginal
Renovation, Infrastructure
Results
WY

Windcreek Gravel Road Rehabilitation Project at Keyhole State Park
Infrastructure
Results
$400,000 est. value
Moorcroft, WY 82721

Last Updated 10/25/2022 07:38 AM
Project Title

Arch Creek Bridge Replacement

Physical Address View project details and contacts
City, State (County) Sundance, WY 82729   (Crook County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $350,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Sitework/Excavating and Grading, Traffic Control, Miscellaneous, Bridge (Replacement or Rehabilitation), Excavation, Stormwater Improvements The work includes the furnishing of the labor, materials, equipment, and services for the construction of the following: fabrication and erection of a prefabricated bridge across Arch Creek, temporary detour road during bridge construction, temporary traffic control during construction, excavation, backfill, and compaction of roadwork up to the new bridge; site grading; installation and maintaining storm water control; and other incidentals required for completion of the project. Arch Creek Bridge, 8.35 miles SE of Exit 172 or 0.48 miles East of the intersection of US-179 and US-109 north of Hulett, WY near the intersection of County Road 262 and County Road 222. Estimated Range $300k - $350k *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents