Similar Projects
Purchase of Biosolids ODOR Control and Class B Treatment System
Post-Bid
Less than $814,662 est. value
OH

Panarad Disposal
Term Contract
Post-Bid
Wright Patterson Air Force Base, OH

Y--Address and Resolve Hazmat Deficiencies
Results
$2,000,000 to $5,000,000 est. value
Chillicothe, OH 45601

CSC-19508 Building 302 Lead Abatement
Results
Columbus, OH 43213

Hazardous Substance Emergency Response and Remediation
Post-Bid
Wright Patterson Air Force Base, OH 45433

F--DOE EM Nationwide Deactivation, Decommissioning and Removal (DD&R)
Results

Hazardous Waste Removal Services for Forensic Chemistry Center
Post-Bid
Cincinnati, OH 45237

Q--Tiered Evaluation: Regulated Medical Waste Disposal
Results
Chillicothe, OH

Biosolids Disposal
Post-Bid
Ravenna, OH 44266

Nuisance Abatement Program Commercial and Residential Asbestos Surveys and Post Abatement Verification Inspections I 2020
Results
Less than $44,310 est. value
Dayton, OH

Lead Paint Hazard Control Contractor Pool
Post-Bid
OH

Asbestos Removal of Niles Times Building
Results
Niles, OH

Sources Sought Hazardous, Toxic, and Radiological Waste (HTRW) Services
Post-Bid
Huntington, WV

Abatement Bid Package 2
Results
Less than $68,400 est. value
Upper Arlington, OH 43221

Infectious Waste Disposal
Post-Bid
OH

Last Updated 10/21/2021 03:07 PM
Project Title

Luckey Remediation Services

Physical Address View project details and contacts
City, State (County) Luckey, OH   (Wood County)
Category(s) Environmental
Sub-Category(s) Hazardous Waste Disposal
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000,000 to $250,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Remediation activities and all required support at the Formerly Utilized Sites Remedial Action Program (FUSRAP) Luckey Site near the Village of Luckey: work and services will consist of environmental remediation and support for the U.S. Army Corps of Engineers (USACE). The project involves excavation, transport, and disposal of FUSRAP-contaminated soil, sediment, and materials at a properly licensed facility. Contaminants of concern consist of beryllium, lead, radiun-226, thorium-230, uranium-234, and uranium-238. Additional activities may include, but are not limited to: • Overall site maintenance and security • Project management and construction quality assurance / quality control • Preparation of project work plans and engineering design for USACE approval • Perimeter and site-wide air monitoring • Sampling and analysis of soils/fill, water, industrial hygiene, and contamination control samples • Operation of a DoD ELAP-approved on-site laboratory • Storm water and wastewater management and control • Decommissioning and installation of monitoring wells • Building demolition and debris disposal • Investigations to determine the presence of contamination beneath buildings • Remedial compliance sampling and analysis • Backfilling and restoration of remediated areas • Development, implementation and maintenance of an environmental data management system based on the AFCEE ERPIMS data model for the duration of the project. The data management system must be accessible via a web based GUI. • Supporting USACE during meetings with the public, local officials, and regulators • Site demobilization Material characterization, handling and management will require strict control and accounting. Procedures will need to be developed and implemented to ensure safety at the site and during transportation. ANTICIPATED CONTRACTOR REQUIREMENTS Offerors must have knowledge and experience in: - Beryllium worker health and safety training requirements; beryllium environmental health and safety monitoring; and beryllium medical surveillance requirements - Health physics and radiation safety training and monitoring - Environmental response actions associated with investigation, design, removal, and construction activities mandated by FUSRAP - Large scale construction remediation to include shoring, dewatering, on-site water treatment, excavation and handling of soils/fill impacted with beryllium, lead, and radionuclides - Transportation and disposal of beryllium, lead, and radiologically contaminated material - Management, staffing, and operation of an on-site laboratory - Collection, management, and treatment of water during site activities - Operation and maintenance of air monitoring systems that include a meteorological station and fixed and portable air monitoring systems to provide early detection of potential contaminant emissions - Development, implementation, and maintenance of web based project environmental data management systems - Environmental building demolition and debris disposal - Emergency response / pollution control - Site closure protocols using the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) - Site restoration - Earned Value Management System reporting - Cost Reimbursable contracts with the United States Government

Details

Division 02 - Existing Conditions, Hazardous Material Assessment, Site Remediation, Contaminated Site Material Removal.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents