Similar Projects
RFP Design - Design and Construction of Mckee Run Control House
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Dover, DE 19904

Puncheon Run Transmission Bypass - Kent County
Infrastructure
Conception
$2,600,000 CJ est. value
Dover, DE 19904

NCALL Office Building
New Construction, Infrastructure - 7,920 SF
Design
$1,500,000 CJ est. value
Dover, DE 19904

Smyrna Farmers Market
Demolition, New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Smyrna, DE 19977

Harrington Yard Site Improvements
Infrastructure
Bidding
$500,000 CJ est. value
Harrington, DE 19952

ADA Parking Area Remediation Kent County Recreation Center
Infrastructure
Bidding
$300,000 CJ est. value
Dover, DE 19904

Calvary Baptist Church / Dover
New Construction, Infrastructure - 27,000 SF
Post-Bid
$9,000,000 CJ est. value
Dover, DE 19904

Laboratory Expansion - Bid Package 2: Steel, Carpentry, General Work
Addition, Demolition, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Smyrna, DE 19977

World-Wide Water Storage Tank Remediation
Term Contract
Results

Water Meter
Term Contract
Results
Dover, DE

1165 South DuPont Boulevard Mixed Use Development
New Construction, Infrastructure - 57,600 SF
Pending Verification
$15,000,000 CJ est. value
Smyrna, DE 19977

Modwash / Dover
New Construction, Infrastructure - 4,660 SF
Pending Verification
$1,200,000 CJ est. value
Dover, DE 19901

Route 13 Forcemain Relocation - South Dover - County of Kent
Infrastructure
Conception
$5,000,000 CJ est. value
Dover, DE 19901

Deck Sealing New Castle County, FY 23
Infrastructure
Bidding
$500,000 CJ est. value
Harrington, DE 19952

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Last Updated 09/29/2022 08:01 AM
Project Title

North Duck Creek Water Tower

Physical Address View project details and contacts
City, State (County) Smyrna, DE 19977   (Kent County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $3,500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Construct North Duck Creek Water Tower, which includes a new 750,000 gallon spherical single-pedestal elevated water tank, foundation, HVAC, plumbing, electrical, instrumentation and controls, controller modification at the existing Well House #1, telemetry, painting, onsite piping, construction of water main extensions across and along both sides of Route 13, valving, hydrants, fencing, sliding gate, site entrance and access road, site grading and improvements, stormwater infiltration basin, erosion & sediment control, maintenance of traffic, and all appurtenances and incidental items, shown on the plans and in accordance with the Town of Smyrna Standard Specifications, AWWA Standards, State of Delaware regulations, and meeting all permitting requirements. The project location of the elevated water tank is at 5495 DuPont Parkway, Smyrna, Delaware. The contractor will be required to deliver all supervision, labor, materials, equipment and other necessary resources to safely and successfully complete all work described in the conditions and specifications for this project. All work must be completed within Four Hundred and Twenty-Five (425) consecutive days of the date of the Notice to Proceed. To obtain a copy of the Contract Documents, please contact Christine Hinton of KCI Technologies, Inc.; Telephone: (302) 318-1125; Email: christine.hinton@kci.com. QUESTIONS General questions regarding this project should be directed to Town of Smyrna, Attn: Mr. Jason McNatt, Director of Public Works, 27 Market Street, Smyrna, DE 19977. Phone: (302) 450-2781 Email: jmcnatt@smyrna.delaware.gov. Questions regarding Technical Specifications and Contract Drawings should be directed to KCI Technologies, Inc., Attn: Ms. Lijie Li, P.E., Project Manager, 1352 Marrows Road, Suite 100, Newark, DE 19711; Phone: (484) 325-5431; Email: lijie.li@kci.com.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents