Similar Projects
Community Center Memorial Room AV and Stage Lighting Replacement Project
Infrastructure, Renovation
Design
$800,000 CJ est. value
Wheaton, IL 60189

Uninterruptible Power Supply (UPS) System and Battery Replacement
Renovation
Sub-Bidding
$93,000 CJ est. value
Glen Ellyn, IL 60137

Public Works Switch Replacement
Alteration
Post-Bid
Downers Grove, IL

Electrical Wire and Cable
Alteration
Post-Bid
Downers Grove, IL

Woodridge Greene-Valley WWTP and Knollwood WWTP
Alteration
Results
Burr Ridge, Woodridge, IL 60517

Edward Hospital Substation Transformer Replacement
Alteration
Results
Naperville, IL 60540

Electrician Services
Alteration
Post-Bid
Naperville, IL

Well No. 5 Sodium Hypochlorite System
Demolition
Results
$144,000 est. value
Lisle, IL

E-Rate Low Voltage Structured Cabling Systems BP4D
Alteration
Post-Bid
Hinsdale, IL 60521

City Hall Technology Upgrade Electrical Services
Alteration
Results
Wheaton, IL 60187

Electric Substations - Springbrook Fixed Axis Solar Photovoltaic Systems
Alteration
Post-Bid
La Grange, Naperville, IL 60540

Oak Brook Golf Club Parking Lot Lighting Improvements
Alteration
Results
Oak Brook, IL 60523

Board of Education Audio and Video Equipment
Term Contract
Post-Bid
Addison, IL 60101

North and South High School HVAC 2022
Alteration
Results
Downers Grove, IL

2022 Water Street Parking Sensor Replacement
Alteration
Post-Bid
$75,000 est. value
Naperville, IL 60540

Last Updated 05/01/2023 02:03 PM
Project Title

Building Immersive Lab Lighting Controls - Phase 2

Physical Address View project details and contacts
City, State (County) Glen Ellyn, IL 60137   (DuPage County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Robert J. Miller Homeland Security Education Center (HEC) Building Immersive Lab Lighting Controls - Phase 2 A Bid Security in the form of a bid bond, cashier's check or certified check in the amount of fifteen percent (15%) of the total base bid is required for this project The College of DuPage is committed to the economic development of disadvantaged business enterprises; qualified Minority, Women, and Persons with Disabilities Owned Businesses are highly encouraged to participate College of DuPage Board of Trustees Reserves the right to reject any and all responses Question Deadline 03/21/2023 at 2:00 PM CT Topic: Pre-Bid 2023-B0035 - Robert J. Miller Homeland Security Education Center (HEC) Building Immersive Lab Lighting Controls - Phase 2 Time: Friday, March 17, 2023 at 10:00 a.m. Central Time (US and Canada) Join Zoom Meeting: https://cod.zoom.us/j/4032153786 Meeting ID: 403 215 3786 One tap mobile +13126266799,,4032153786# US (Chicago) Dial by your location +1 312 626 6799 US (Chicago) +1 301 715 8592 US (Washington DC) +1 646 558 8656 US (New York) +1 669 900 6833 US (San Jose) Meeting ID: 403 215 3786 Find your local number: https://cod.zoom.us/u/kb8Pu8UUch 2023-B0035 - ROBERT J. MILLER HOMELAND SECURITY EDUCATION CENTER (HEC) BUILDING IMMERSIVE LAB LIGHTING CONTROLS - PHASE 2 3.1 OVERVIEW A. The College of DuPage is seeking competitive bids for the Robert J. Miller Homeland Security Education Center (HEC) Building Immersive Lab Lighting Controls - Phase 2. B. All work as indicated in the project drawings and specifications prepared by Grumman/Butkus Associates with Issue for Bid date of March 2, 2023. C. Phase 2 work includes replacing the existing 208y/120v theater lighting dimming system for the COD Homeland Security Center (HEC) Building Immersive Training Lab. The new Theater dimming system will be connected to the existing Incandescent theater lighting. However, the new controls shall be forward compatible with 0-10v dimming led theatrical lighting as well as be forward compatible with color changing LED theater lighting and other DMX controlled fixtures. Refer to the plans in Exhibit B for additional requirements and complete scope of work. D. Work shall be substantially complete prior to July 31, 2023. E. The company identified as lowest and responsible responder will be executing the College's Standard Small Contract Agreement, (terms and conditions are not alterable). A sample contract is attached for reference. Please note prevailing wage, bond and insurance requirements.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents