Similar Projects
Annual Contract for Plumbing/Mechanical Work
Term Contract
Post-Bid
Salt Lake City, UT 84115

Annual Contract for General Plumbing Fittings and Supplies
Term Contract
Post-Bid
Salt Lake City, UT 84115

Weatherization Program
Results
Price, UT

Housing Maintenance Services
Term Contract
Results
Fort Duchesne, UT 84026

Jordan Hills Reservoir Pipe Replacement Project
Post-Bid
West Jordan, UT 84088

Plumbing/Venting Updates Station 113
Results
Salt Lake City, UT 84119

Shower/Kitchen/Bathroom Remodel Plumbing
Post-Bid
UT

Plumbing
Results
Logan, UT 84322

U Hospital Mediserve Renovo Dock Remodel - Plumbing
Post-Bid
$1 to $737,500 est. value
Salt Lake City, UT 84113

SLCC Water Fountain Elkay Bottle Filling Station
Results
$50,000 to $60,000 est. value
Salt Lake City, UT 84130

School of Medicine 5 West Patient Safety Upgrade - Plumbing
Results
$40,000 est. value
Salt Lake City, UT 84132

School of Medicine 5 West Patient Safety Upgrade - HVAC/Plumbing
Results
Less than $200,000 est. value
Salt Lake City, UT 84112

Plumbing Services
Term Contract
Results
Salt Lake City, UT 84111

DFCM Construction - General Contractors - Grassy Mountain Restarea Plumbing
Results
$160,000 est. value
Grantsville, UT 84029

T and S Plumbing and Delta Plumbing Items-Contract
Term Contract
Results
Clearfield, UT 84016

Last Updated 11/18/2020 05:49 PM
Project Title

UU FMAB Restroom Upgrade FY19

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT   (Salt Lake County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $350,800
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes the remodel of a portion of existing building #36 Film and Media Arts Building. The work includes the demolition of the existing restrooms on the main level and the construction of new code compliant restrooms that may be easily converted into the unisex design model in the near future. Two existing water service lines (running back to building #37) will be replaced. The work includes all of the structural, architectural, mechanical, electrical, plumbing, fire protection, security and IT modifications needed to accommodate the construction of the new restrooms.

Details

Division 01 - General Requirements, Temporary Utilities, Temporary Fire Protection, Facility Services Performance Requirements, Electrical Performance Requirements.
Division 02 - Existing Conditions, Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Schedules for Metals, Schedules for Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents