Similar Projects
Pipes, Valves, and Fittings
Term Contract
Design
Detroit, MI 48226

RFP - Parking Management Services
Term Contract
Bidding
Detroit, MI 48226

Ductile Iron Pipe - Various Sizes
Term Contract
Sub-Bidding
Detroit, MI 48211

Cleaning of Catch Basins / Cleaning and Video Inspection of Siphons
Term Contract
Sub-Bidding
Dearborn, MI 48126

Pest Control
Term Contract
Post-Bid
MI

Portable Toilets
Term Contract
Post-Bid
Westland, MI

Tree & Brush Trimming, Removal & Related Services
Term Contract
Results
Detroit, MI

Exterior Window Cleaning and Power Washing Outdoor Surfaces at Detroit Operations and Service Center
Alteration
Results
Detroit, MI 48226

Sanitary Drain Cleaning and Disposal Services
Term Contract
Sub-Bidding
Detroit, MI 48226

Pest Control
Term Contract
Post-Bid
Detroit, MI

Snow and Ice Removal
Term Contract
Sub-Bidding
Dearborn, MI 48126

Disposal of Solid Waste Materials
Term Contract
Post-Bid
Westland, MI 48185

Non-Freeway Mowing Services in Wayne County - TTSC
Term Contract
Sub-Bidding
Wayne, MI 48184

Window Washing
Term Contract
Post-Bid
Livonia, MI 48154

Barrel and Sludge/Wastewater Removal and Disposal Services
Term Contract
Sub-Bidding
Detroit, MI 48226

Last Updated 01/06/2023 02:10 PM
Project Title

Full Lead Service Line Replacement at Various Locations Throughout the City

Physical Address View project details and contacts
City, State (County) Detroit, MI 48226   (Wayne County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

WS-735 The Project includes the following Work: The scope of work includes identifying existing Lead (Pb) service lines, meeting with customers to get access and permission to do work on private residential or commercial property, delivering water quality information, replacing existing Lead (Pb) service lines, and recordkeeping. The approximate locations of the replacements that will be assigned to the Contractor will be identified by the Engineer on an "asneeded" basis pursuant to the terms and conditions of the Contract Documents. There is no guarantee as to the number of replacement locations that will be assigned under this Contract. However, about 2,500 lead service line replacements are expected to be assigned throughout the life of this Contract. A more detailed description of the work is stated in Exhibit A of the Agreement. The Detroit Water and Sewerage Department (DWSD) has prepared this contract for the purpose of replacing full lead service lines, from the existing water main to the meter inside the home/property, and at locations where unplanned work results in the disconnection of any Lead service, on either the private property or within the public Right-of-Way (ROW). Detroit has an estimated 80,000 lead service lines (LSLs), connected to an aged and historically under-maintained water network, with high incidences of water main breaks. Main breaks and service leaks frequently affect LSLs and require disconnecting the LSL to make a repair. The contractor hereby agrees to perform all work assigned by the Engineer no matter where located, at the unit price established in the bid schedule. The contractor will be responsible for following DWSD's Full Lead Service Line Replacement (FLSLR) Standard Operating Procedures (SOPs) and specification to efficiently, effectively, and safely remove full LSLs. Because this contract will be providing work for unplanned service replacement, not all of the locations of the work are defined at this time. Also, no design drawings will be provided by DWSD. DWSD expects the contractor to complete about 2,500 LSL replacements through this contract. Restoration of each LSR site will be in accordance with DPW standards. This standard can be found. The Bidder agrees that any work including unmarked underground utilities that may be required to complete any specific item shall be considered incidental and no claim for additional compensation will be made. The work adjacent to any Wayne County, MDOT, and Detroit DPW road jurisdictions shall be in accordance with the requirements of the Wayne County, MDOT, and Detroit DPW Authorities respectively. Due to the extreme inconvenience to Detroit Water and Sewerage water service customers and the public in general, and also due to the impossibility of performing prompt, permanent restoration during the winter season, work on the Contract shall be temporarily halted after the second week of November or as authorized by the Engineer. The Contract work shall promptly resume during the third week of April of the following year or as authorized by the Engineer. The Project has an expected duration of 1095 calendar days. Buyer's Requirements General Requirements - Bid Deposit Required - FOB Destination - Insurance Required - Safety Standards Plan Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % - Warranty Bond 10 %

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents