Similar Projects
2021 Capital Improvement Program(CIP)Project
Bidding
Greenwood Village, CO

Alley and Stormwater Improvements Project 2021
Infrastructure
Bidding
Crescent, CO

CR Water Projects Request for Pre-qualifications
Post-Bid
Castle Rock, CO 80104

Sterling Ranch Middle Fork Street
New Construction
Post-Bid
Highlands Ranch, CO

2020 Cherrymoor South Interceptor Rehabilitation
Results
Cherry Hills Village, CO 80113

South Englewood Storm Sewer Maintenance
Results
Englewood, CO 80110

Vista Ridge Hs Drainage Improvements
Infrastructure
Bidding
Colorado Springs, CO 80923

On-Call General Construction Services
Term Contract
Post-Bid
Brighton, CO 80601

2019 Ridge Road Storm Sewer Project
Results
Less than $248,850 est. value
Littleton, CO 80120

Mississippi Avenue and Kenton Way Stormwater Improvements
Alteration
Bidding
$3,400,000 to $3,700,000 est. value
Aurora, CO

Stormwater Facility Maintenance
Post-Bid
Canon City, CO

2020 Townwide Storm Pipe Camera and Vacuum Cleaning
Results
$30,000 to $50,000 est. value
Parker, CO

Storm Sewer Clean and Video Inspection
Infrastructure
Bidding
Frisco, CO

2020 Sikis Subdivision Sewer Replacement Project Phase II
Post-Bid
Cortez, CO 81321

Tollgate and Sand Creek Interceptor Diversion Structures Rehabilitation Phase 2
Results
$3,210,000 to $3,370,500 est. value
Aurora, CO 80012

Last Updated 05/20/2021 10:34 AM
Project Title

Stout Sewer Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Craig, CO   (Moffat County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work of this Contract generally consists of the following system improvements, to be completed one at a time in the order listed: Rehabilitation of approximately 1012 LF of existing 8" VCP sewer pipe in the Stout Street alley, through CIPP lining of the pipe and service laterals, plus repair and cementitious lining of two existing manholes. All work to be complete within existing City streets and Right-of-Way. All disturbed areas to be restored to existing conditions or better.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents